STEM PACKING REPLACEMENT

WARNING

To avoid injury to yourself, fellow workers, or damage to property from 

release of process fluids, ensure that all pressure is removed from the 

valve both upstream and downstream before disassembly.

 

Loosen the gland nut (10) and remove the gasket (9) and the bonnet 

bolt (11). Lift the gland (8) to tie and secure it with string or wire. 

(See Figure 1).

 

Use a suitable tool to remove the existing packing ring (3). Do not 

scratch or damage the surface of the stem or packing with tools.  

Next tie the loose packing rings (3) with string or wire 

(see Figure 1).

 

Check that the stem and packing are intact. Any burrs and scratches 

should be removed with emery cloth. Clean the valve stem with a 

cloth soaked in solvent.

 

Count the original number of packing rings.

 

If replacing with new packing, use a sharp tool to cut each ring 

at a 45° angle (see Figure 2), stagger adjacent packing openings 

90°–120° into the bonnet packing groove. (See Figure 3). 

Tamp each ring when installing.

 

After the packing groove is filled with the packing rings, reassemble 

the gland, gland nuts (10), washers (9) and bonnet bolts (11). 

Alternately tighten the gland nuts (10) one quarter turn at a time 

until the gland nuts (10) begin to tighten.

 

Open and close the valve with handwheel (12). The action should be 

smooth throughout the stroke. Adjust the tightness of the packing by 

adjusting the gland nut. If the packing leaks, turn the gland nut (10) 

evenly in 1/4 turn increments until it stops.

(10)

8. If

leak

).

f the packin

k stops. 

 

ng leaks, turrn the gland

 

d nut (10) eevenly in 1//4 turn increements until the 

Figure 1

 Stem packing replacement

(10)

8. If

leak

).

f the packin

k stops. 

 

ng leaks, turrn the gland

 

d nut (10) eevenly in 1//4 turn increements until the 

Figure 2

(10)

8. If

leak

).

f the packin

k stops. 

 

ng leaks, turrn the gland

 

d nut (10) eevenly in 1//4 turn increements until the 

Figure 3

Содержание FIGURE 751

Страница 1: ...ction to ensure that there is no water accumulation on or in the valve The valve comes with a protective end cap to prevent mechanical damage and prevent the intrusion of dust and foreign objects If a...

Страница 2: ...er the valve is installed re check all the bolts and nuts of the connecting flanges and re tighten them if they are found to be loose OPERATION Gate valves are not designed for throttling modulating s...

Страница 3: ...tightend Inadequate amount of packing rings Install additonal packing rings Packing is hard and dry Replace with new packing Leakage through the stem packing Packing was not properly cut and staggered...

Страница 4: ...Repair damaged area and install a new gasket Valve is not properly seated Check with hand wheel to see if the valve is tightly closed Leakage past the seat There is an obstruction between the seat and...

Страница 5: ...in the operation section Intermediate positioning is not recommended If necessary immediately tighten any loose bolts and grease around the valve stem PERIODIC INSPECTION Valves should be inspected p...

Страница 6: ...e or other foreign matter Wipe disc 4 with a cloth Clean body 5 and bonnet 2 inside and outside surfaces and all nuts and bolts Put packing 3 into the packing groove of bonnet 2 align and center the p...