FMUSER INTERNATIONAL GROUP INC.
广州市汉婷生物技术开发有限公司
9
/
57
Chapter 3 Installation Guide
3.1 Acquisition check
When users open the package of the device, it is necessary to
check items according to packing list. Normally it should include
the following items:
l
FUTV4440B 4IN1 QAM Modulator
l
User’s Manual
l
AC Power Cord
l
ASI/Tuner wire
If any item is missing, please inform local dealer.
3.2 Installation Preparation
When users install device, please follow the below steps. The
details of installation will be described at the rest part of this
chapter. Users can also refer rear panel chart during the
installation.
The main content of this chapter including:
Checking the possible device missing or damage during the
transportation
Preparing relevant environment for installation
Installing 4IN1 QAM modulator
Connecting signal wires