www.fmiproducts.com
124702-01B
15
INSTALLATION
Continued
Installation must include an equipment shutoff
YDOYHXQLRQDQGSOXJJHG137WDS/RFDWH
137WDSZLWKLQUHDFKIRUWHVWJDXJHKRRNXS
NPT tap must be upstream from heater (see
Figure 14).
IMPORTANT:
Install equipment shutoff valve
in an accessible location. The equipment
shutoff valve is for turning on or shutting off
the gas to the appliance.
Check your building codes for any special
requirements for locating equipment shutoff
YDOYHWR¿UHSODFHV
Apply pipe joint sealant lightly to male NPT
WKUHDGV7KLVZLOOSUHYHQWH[FHVVVHDODQWIURP
going into pipe. Excess sealant in pipe could
result in clogged heater valves.
:$51,1* 8VH SLSH MRLQW
VHDODQWWKDWLVUHVLVWDQWWROLTXLG
SHWUROHXP/3JDV
We recommend that you install a sediment trap
LQVXSSO\OLQHDVVKRZQLQ)LJXUH/RFDWH
VHGLPHQW WUDS ZKHUH LW LV ZLWKLQ UHDFK IRU
FOHDQLQJ ,QVWDOO LQ SLSLQJ V\VWHP EHWZHHQ
fuel supply and heater. Locate sediment
WUDS ZKHUH WUDSSHG PDWWHU LV QRW OLNHO\ WR
IUHH]H$ VHGLPHQW WUDS WUDSV PRLVWXUH DQG
contaminants. This keeps them from going
into heater controls. If sediment trap is not
LQVWDOOHG RU LV LQVWDOOHG ZURQJ KHDWHU PD\
not run properly.
&$87,21$YRLGGDPDJHWR
JDVROGJDV¿WWLQJZLWK
ZUHQFK ZKHQ FRQQHFWLQJ LW WR
JDVSLSLQJDQGRU¿WWLQJV
* Purchase the optional equipment shutoff
valve from your dealer.
** Minimum inlet pressure for purpose of input
adjustment.
Figure 14 - Gas Connection
Gas
Control
3” Minimum
Equipment Shutoff
9DOYH:LWK
NPT Tap*
Approved
Flexible
Gas Hose (if
DOORZHGE\
local codes)
3523$1(/3
From External
5HJXODWRU
:&WR:&
Pressure)
NATURAL
From Gas Meter
:&WR
:&
Pressure)
Cap Pipe Tee
Nipple Joint
Sediment Trap