ALIGNING AND LEVELING MIXER
14
Fluid Management
®
REMOVE SHIPPING INSERTS
After you have plugged the mixer into a dedicated power line and leveled it,
inspect to be sure that you have removed the shipping materials inside the
mixer.
Refer to Figure 3 on page 16 for a diagram of the control panel.
1. Make sure the front door of the paint mixer is closed. A safety switch
prevents the operation of the paint mixer while the door is open.
2. Apply power to the paint mixer by placing the POWER switch in the ON
position.
3. Turn the button labeled EMERGENCY STOP clockwise until the button
pops out to the ON position. If the button does not turn, then it is already
in the ON position. To stop or turn off the paint mixer, push the
button to the OFF position.
4. Push the UP button. Wait several seconds until the UP light goes out and
the top plate raises high enough for you to remove the shipping inserts.
5. Open the front door of the paint mixer. Remove the shipping inserts and
the wooden disc insert. If there is not enough room to remove the inserts,
then push the UP button again.
6. Be sure that you save the plywood and the foam rubber discs. These
will be used with 5-gallon pails.
7. Before performing an operational test, read the following information
Getting To Know Your Mixer.
Содержание HARBIL 24018
Страница 4: ...4 Fluid Management...
Страница 28: ...TROUBLE SHOOTING CHART 28 Fluid Management NOTES...
Страница 58: ...REASSEMBLING MIXER 58 Fluid Management NOTES...