
Flight manual
MD3
RIDER
Page 8-3
8.2.3. Mooring
The airplane mooring equipment consists of the following:
- 3 mooring bolts
- 2 long and 1 short mooring cables
Mooring bolts should be screwed in the ground and the airplane
should be moored by means of cables as shown below:
1 - Mooring cable
2 - Mooring bolt
3 - Cable to join stabilizers
I - Mooring ring(bolt) detail
II - Cable fixing to the landing gear hinge
III - Cable fixing to the wing hinge