Make certain:
•
The mains power connection must only be made via a fixed connection.
•
The mains power supply line must be equipped with an all-pole separator with a contact
opening of 3 mm.
•
Equipotential bonding with a cross-section of 10 mm² must be applied on the
connection terminal so identified (on the motor mount or next to the terminal box).
Compare the existing mains power supply with the information on the motor nameplate
(Section 1.1 "User information") and select a suitable circuit.
We recommend using a motor protection device. Motors with explosion protection,
increased safety (Ex)-e, temperature class T3, must always be connected in accordance
with DIN VDE 0170/0171 using a motor protection switch.