Fluke PRUFTECHNIK VIB 6.172 Скачать руководство пользователя страница 6

6

Electrical connection

Only electricians are allowed to install accelerom-
eters. Comply with the national and international 
regulations for the installation of electrical equip-
ment. 

For the electrical connection to a 

stationary

 

condition monitoring system (CMS), the following 
connection cables are suitable.

For accelerometer 

VIB 6.172

:

 

– Sensor cable with silicon coating and straight

cable connector, X meters long, 

VIB 5.740-X

 

– Sensor cable with silicon coating and angled ca-

ble connector, X meters long, 

VIB 5.741-X

 

– Sensor cable with PUR coating and straight ca-

ble connector, stainless steel, X meters long,

VIB 5.746-L

 

– Sensor cable with PUR coating and angled cable

connector, X meters long, 

VIB 5.745-L

For accelerometer 

VIB 6.210

:

 

– Sensor cable with angled cable connector, 10

meters long, 

VIB 3.575-10

 

– Sensor cable with angled cable connector, 20

meters long, 

VIB 3.575-20

Please find the technical data of the cables in 
the sensor and cable catalogue, which you can 
download from the PRUFTECHNIK website (www.
pruftechnik.com).

Lay the cable

• Lay the cable in a cable conduit or a protective

tube.

• Use Velcro strips or cable ties for mounting.
• Do not lay the connection cable parallel to pow-

er lines. Keep a minimum distance (> 1m).

• Lay a cable loop with sufficient excess cord at

each connection or before each gland.

• Label the cable ends to avoid confusion.
• Observe the terminal assignments on the CMS

(see CMS installation manual).

Extend the cable

• Observe the maximum cable lengths (see CMS

installation manual).

• Use shielded, 2-wire electrical cables for exten-

sion.

• Connect the cable ends in a junction box.
• Mount a metal junction box electrically insulat-

ed.

EMC protection

• Use double-shielded triaxial cables in environ-

ments exposed to strong electromagnetic radi-
ation.

• Keep the accelerometer connection cable as

short as possible.

• Connect the triaxial cable and the accelerome-

ter connection cable in a junction box.

• Mount the junction box close to the accelerom-

eter.

Pin allocation, cable 

CABLE

VIB 3.575-10 / VIB 3.575-20

Pin 

1

2

3

4

Color code

BN 

BU 

BK

Drain wire

(shield)

CABLE

VIB 5.740-X
VIB 5.741-X

VIB 5.745-L
VIB 5.746-L

Pin 

A

B

A

B

Color code

BN 

BU 

WT 

BN

BN: brown / BU: blue / WT: white / BK: black

Содержание PRUFTECHNIK VIB 6.172

Страница 1: ...Accelerometer 100mV g VIB 6 172 VIB 6 210 Installation and Operation ...

Страница 2: ...mity is available at www pruftechnik com Repair and Maintenance The operation of the accelerometer is mainte nance free A repair is not possible Disposal Dispose of the accelerometer after use in accor dance with applicable national regulations Mounting The frequency response and dynamic range of an accelerometer can be greatly influenced by the installation Poor coupling to the measurement locati...

Страница 3: ...nding position Leave enough space around the adapter in order to apply the bonding compound Flattening and roughening Sand down any paint on the mounting surface to bare metal Ø 30 mm Level out the mounting surface if necessary Roughen the mounting surface with a file filing a few grooves in a diamond pattern provides great er adhesion Optional and only if drilling at the mounting lo cation is pos...

Страница 4: ... output 12 V DC Grounding insulated from machine ground internal shielding Transverse sensitivity 5 Temperature sensitivity 0 07 of measurement K ref 25 C Magnetic field sensitivity 0 1g T at 50 Hz Base strain sensitivity 0 1mg µm m Electrical noise r m s 1 0 mg 0 1 Hz 10 kHz 1 5 mg 0 1 Hz 10 kHz Output impedance 10 Ohm 100 Ohm Mechanical Case material Stainless steel VA 1 4305 Environmental prote...

Страница 5: ... o m e t e r T y p e V I B 6 2 1 5 S N P 0 0 0 0 5 X Installation height 68 1 Signal 2 nc 3 GND 4 nc 1 4 3 2 Pin allocation accelerometer Signal A GND B VIB 6 172 VIB 6 210 22 22 M8 M8 VIB 5 740 X VIB 5 741 X VIB 3 575 10 VIB 3 575 20 VIB 6 172 VIB 6 210 ...

Страница 6: ...ite www pruftechnik com Lay the cable Lay the cable in a cable conduit or a protective tube Use Velcro strips or cable ties for mounting Do not lay the connection cable parallel to pow er lines Keep a minimum distance 1m Lay a cable loop with sufficient excess cord at each connection or before each gland Label the cable ends to avoid confusion Observe the terminal assignments on the CMS see CMS in...

Страница 7: ...449 ICP VIB 5 438 0 5 VIB 93055 VIB 311221 10 TNC VIB 5 449 ICP VIBSCANNER VIBXPERT II VIBXPERT I VIBGUARD portable VIB 5 444 5 Mini Snap Extension cable optional Cable adapter Connection options for accelerometer VIB 6 172 to portable measurement devices ...

Страница 8: ...Fluke Deutschland GmbH Freisinger Str 34 85737 Ismaning Germany 49 89 99616 0 www pruftechnik com Productive maintenance technology VIB 9 833 EN 08 2018 ...

Отзывы: