Fluke PRUFTECHNIK VIB 6.172 Скачать руководство пользователя страница 3

3

• Clean the area around the mounting hole and

roughen it with abrasive paper (type 220).

• Clean the contact surfaces of the accelerometer

/ adapter and of the machine with solvent.

• Allow the contact surfaces to dry and then ap-

ply a thin film of screw paste (LOCTITE 243) to
improve signal transmission.

• Screw in the adapter and tighten with a wrench

Adapter: 10 to 20 Nm

• Screw in the accelerometer by hand (3 to 7 Nm).

Notes

Excessive torque can damage the threads on the 
accelerometer or machine part. Too little torque 
can allow the accelerometer to work loose and 
cause measurement errors!

If the accelerometer is affixed to non-grounded 
machine components (e.g. belt-driven fan), the 
accelerometer must be grounded to prevent static 
charges.

Mounting the bonded adapter

Tools required:

 

– Hand-held drill

 

– Drill bits with depth gauge (3.5 mm)

 

– File

 

– Compressed air for cleaning out the hole

 

– Two-component adhesive (WEICON HB 300,..)

Note

The machine must be switched off during instal-
lation. Afterwards, it must not be switched on for 
at least 24 hours to prevent mechanical vibrations 
during the hardening process.

• Select bonding position:

Leave enough space around the adapter in order 
to apply the bonding compound.

• Flattening and roughening:

Sand down any paint on the mounting surface to
bare metal (Ø > 30 mm).
Level out the mounting surface if necessary.

Roughen the mounting surface with a file (filing a 
few grooves in a diamond pattern provides great-
er adhesion.)

Optional, and only if drilling at the mounting lo-
cation is possible:

• Bore hole for centering pin.

 

– Drill depth approx. 5 mm, Diameter 3.6 mm.

If drilling is not possible, the centering pin on the 
accelerometer base can be removed.

30

3.6

5

• Clean location and mix bonding compound:

Clean mounting surface and bonding socket with
a residue-free degreasant and a clean cloth. Then
allow both metal surfaces to dry completely.

• Mix bonding compound for use.

• Apply bonding compound:

A

pply a thin layer of bonding compound evenly 

with a wooden spatula (approx. 1 mm thick) to 
the base of the adapter and the mounting surface. 

• Mount adapter:

Press the adapter gently against the mounting
surface and turn it a little to evenly distribute the
bonding compound. Do not remove excess bond-
ing compound. Additional bonding compound
can be applied at the bonding location for higher
stability.

Note

An adhesive tape may be used to hold the adapter 
in place during the first hour of hardening.

Содержание PRUFTECHNIK VIB 6.172

Страница 1: ...Accelerometer 100mV g VIB 6 172 VIB 6 210 Installation and Operation ...

Страница 2: ...mity is available at www pruftechnik com Repair and Maintenance The operation of the accelerometer is mainte nance free A repair is not possible Disposal Dispose of the accelerometer after use in accor dance with applicable national regulations Mounting The frequency response and dynamic range of an accelerometer can be greatly influenced by the installation Poor coupling to the measurement locati...

Страница 3: ...nding position Leave enough space around the adapter in order to apply the bonding compound Flattening and roughening Sand down any paint on the mounting surface to bare metal Ø 30 mm Level out the mounting surface if necessary Roughen the mounting surface with a file filing a few grooves in a diamond pattern provides great er adhesion Optional and only if drilling at the mounting lo cation is pos...

Страница 4: ... output 12 V DC Grounding insulated from machine ground internal shielding Transverse sensitivity 5 Temperature sensitivity 0 07 of measurement K ref 25 C Magnetic field sensitivity 0 1g T at 50 Hz Base strain sensitivity 0 1mg µm m Electrical noise r m s 1 0 mg 0 1 Hz 10 kHz 1 5 mg 0 1 Hz 10 kHz Output impedance 10 Ohm 100 Ohm Mechanical Case material Stainless steel VA 1 4305 Environmental prote...

Страница 5: ... o m e t e r T y p e V I B 6 2 1 5 S N P 0 0 0 0 5 X Installation height 68 1 Signal 2 nc 3 GND 4 nc 1 4 3 2 Pin allocation accelerometer Signal A GND B VIB 6 172 VIB 6 210 22 22 M8 M8 VIB 5 740 X VIB 5 741 X VIB 3 575 10 VIB 3 575 20 VIB 6 172 VIB 6 210 ...

Страница 6: ...ite www pruftechnik com Lay the cable Lay the cable in a cable conduit or a protective tube Use Velcro strips or cable ties for mounting Do not lay the connection cable parallel to pow er lines Keep a minimum distance 1m Lay a cable loop with sufficient excess cord at each connection or before each gland Label the cable ends to avoid confusion Observe the terminal assignments on the CMS see CMS in...

Страница 7: ...449 ICP VIB 5 438 0 5 VIB 93055 VIB 311221 10 TNC VIB 5 449 ICP VIBSCANNER VIBXPERT II VIBXPERT I VIBGUARD portable VIB 5 444 5 Mini Snap Extension cable optional Cable adapter Connection options for accelerometer VIB 6 172 to portable measurement devices ...

Страница 8: ...Fluke Deutschland GmbH Freisinger Str 34 85737 Ismaning Germany 49 89 99616 0 www pruftechnik com Productive maintenance technology VIB 9 833 EN 08 2018 ...

Отзывы: