4
Quick Start
4.1
Unpacking
Unpack the dry-well carefully and inspect it for any damage that may have oc-
curred during shipment. If there is shipping damage, notify the carrier
immediately.
Verify that the following components are present:
•
9101 Dry-well
•
2130, Well tube sizing kit
•
Power Cord
•
User’s Guide
•
Report of Calibration
•
Calibration Label
4.2
Set up
Place the 9101 zero point dry-well upright on a flat stable surface. The area
around the instrument must be clear to allow adequate air circulation. For best
results operate the dry-well in room of constant temperature between 18 to
25°C (64 to 77°F) free from drafts. Stable ambient temperatures allow stable
well gradients and less drift.
Turn on the power to the calibrator by toggling the power switch on. The fan
should begin quietly blowing air through the instrument. The amber LED will
light when the unit is energized. The green LED will light when the unit is
ready to use. The unit is not at the correct temperature until the green LED is
illuminated.
4.3
Power
Connect the power cord provided into the instrument and plug the other end
into a power socket of specified voltage. Normally this will be 115 VAC,
+10%, 50/60 Hz. If specified upon ordering the instrument may optionally be
configured to operate at 230 VAC (±10%).
9
4 Quick Start
Unpacking