5.
Re-attach the metal retaining plate (2) using the four screws. The ground
wire from the heat pipe must be routed through the right rear access hole
in the plate and attached to the closest screw using two star washers and
a screw. Make sure that the ground wire is securely attached to the fur-
nace chassis. Check the ground continuity to ensure that the ground wire
is intact and the heat pipe (5) is grounded. Insure that the wire routing
for the Control (6) and Cutout (7) probe is as shown in Figure 2.
13
Figure 2
HTPRT control probe and cutout thermocouple wire routing and heat pipe
ground wire placement..
Содержание 9116A
Страница 1: ...9116A Furnace User s Guide Rev 842101 Hart Scientific ...
Страница 24: ...19 Figure 5 Back Panel ...
Страница 28: ...9116A Furnace User s Guide 24 Figure 6 Controller Flow Chart ...
Страница 56: ...53 8 Fixed Point Cell Installation Instructions Procedure Figure 14 Place insulation in re entrant well ...