![Fluid Management Harbil NSC80 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/fluid-management/harbil-nsc80/harbil-nsc80_operating-and-instruction-manual_2308808011.webp)
Fluid Management Customer Service 1.800.462.2466
Important Safety Information
Harbil NSC80 Series | 11
Filling the Canisters
After all of the canisters have been installed on the turntable, they can be filled. Each canister has a
maximum capacity of 2-1/2 quarts. It is recommended that each canister be filled with two (2) quarts of
colorant. The maximum capacity of the pump is two (2) ounces.
The following steps represent the process by which the canisters should be filled:
1. Locate the first canister and determine which colorant is to be placed into that canister.
2. Place the appropriate decal on the canister.
3.
IMPORTANT – After setting up machine, let machine and colorants warm to room
temperature before pouring colorants into canisters
4. Shake of stir the colorant following manufacturer’s recommendations.
5. Slowly, pour the colorant into the canister to the level of approximately two (2) quarts.
6. Place the top on the canister.
7. Repeat these steps for each of the remaining canisters.
8. After all of the canisters have been filled, agitate by turning on the agitation motor. This will release
any air trapped in the colorant.
Priming the Pumps
Once the canisters have been both filled and agitated, the pumps attached to each of the canisters must be
properly primed. Follow these steps to prime the pumps.
1.
Locate the first canister.
2.
Slowly pull the pump handle all of the way to the top of its stroke and wait in this position for a count of
approximately three (3) seconds.
3.
Slowly press the pump handle all of the way down to the bottom of its stroke.
4.
Repeat these steps five (5) times.
5.
Repeat steps 1 through 4 for each of the remaining canisters.