![Fluid Management HARBIL 5G Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/fluid-management/harbil-5g/harbil-5g_end-user-manual_2308809022.webp)
Operational Test
Operational Test Procedure
1.
Plug in the mixer.
2.
Using two one-gallon containers followed by a five-gallon container, perform
these steps:
•
With the one-gallon containers in position on the table, set the TIMER to
its minimum value.
•
Twist the EMERGENCY STOP to release it.
•
Depress
the
POWER
switch.
•
With one hand on the EMERGENCY STOP, depress the START switch.
The unit should cycle automatically—clamping down and starting the
shake cycle with a smooth, vibration-free movement.
3.
If vibrations are noticed, immediately press down the EMERGENCY STOP
switch.
•
Mild vibrations
may occur because the unit is not properly leveled. Try
slipping a piece of paper under each of the four (4) adjustable feet. If
the paper easily slides under a foot (feet), then the mixer is not solidly
contacting the floor. Level as necessary.
•
Severe or persistent vibrations
may be caused by a variety of problems.
Check to make sure that the struts are moving freely. If they are, then
contact a qualified service technician or Customer Service at Fluid
Management for assistance before continuing to operate the mixer.
4.
Repeat the above steps using a 5-gallon container.
5.
When the unit is operating smoothly, replace and secure the top cover and
upper rear cabinet with the screws.
6.
Your high speed paint mixer is now ready for operation. Please read the next
two sections to familiarize yourself with the machine and how to operate it
safely.
Operational
Test
Fluid Management Customer Service 1.800.462.2466
Harbil 5G Mixer | 19