/ 15 /
TESTING THE LOOP
To make sure the installation of EK components was successful, we rec-
ommend you perform a 24-hour leak test.
When your loop is complete and filled with coolant, connect the pump to
a PSU outside of your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
Inspect all parts of the loop, and in case the coolant leaks, fix the issue and
repeat the testing process. To prevent possible damage, please ensure
that all hardware is dry before the system is powered on.