![Flowserve FlowTop V726 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/flowserve/flowtop-v726/flowtop-v726_disassembly-reassembly-instructions_2308391008.webp)
8
Schmidt Armaturen
AI - FlowTop
Disassembly
Step 02
•
Unscrew hexagon nuts (3.6)
•
Remove washer (3.8) and gland fl ange (3.4)
Reassembly
Step 02 not applicable
Arranging the packing unit see
Step 07
Disassembly
Step 03
• Twist Special Tool
(Ring-nut)
on the stem
and put in place slowly
CAUTION !
Ensure it hangs vertically !
• Remove fl at gasket (1.2)
CAUTION !
Remove remains of fl at gasket (1.2)
in the body and on the bonnet.
Do not damage sealing surface !
Reassembly
Step 03
After work step "Reassembly"
Step 06
•
Insert fl at gasket (1.2)
CAUTION !
Use new fl at gasket (1.2) !
• Twist Special Tool
(Ring-nut)
on the stem
and put in place slowly
CAUTION !
Ensure it hangs vertically !
Содержание FlowTop V726
Страница 1: ...Disassembly Reassembly Instructions FlowTop V726 V738 V740...
Страница 6: ...Schmidt Armaturen AI FlowTop...
Страница 10: ...10 Schmidt Armaturen AI FlowTop...
Страница 16: ...16 Schmidt Armaturen AI FlowTop...
Страница 22: ...22 Schmidt Armaturen AI FlowTop...
Страница 29: ...29 Schmidt Armaturen AI FlowTop...
Страница 33: ...33 Schmidt Armaturen AI FlowTop...
Страница 37: ...37 Schmidt Armaturen AI FlowTop...
Страница 60: ...60 Schmidt Armaturen AI FlowTop...
Страница 66: ...66 Schmidt Armaturen AI FlowTop...