59
Journal report example
Event journal for meter S/N 00050
с
29/06/2010
по
29/06/2010
14/09/2010 13:41:03; page 1 of 1
Pos.
Date
Journal record
1
29/06/2010 07:44:09 Exit from "SETUP" mode
2
29/06/2010 07:43:45 End of reset
3
29/06/2010 07:43:45 Data clearing …
4
29/06/2010 07:42:20 3.2.Archive _Volume_
5
29/06/2010 07:42:02 "SETUP" mode enter
Содержание SVTU-11B
Страница 1: ...Water meter SVTU 11B Operating manual SMP 407251 010 Part 1 September 2010...
Страница 2: ......
Страница 29: ...29 Figure 9 7 Installation of R D S of type 2 3 and 4 without thermal pocket...
Страница 30: ...30 Figure 9 8 Installation of R D S of type 2 3 and 4 with thermal pocket...
Страница 37: ...37 Figure 11 1...
Страница 40: ...40 Figure 121 1...
Страница 49: ...49 Appendix C Overall and connecting dimensions of calculator 17...
Страница 51: ...51...
Страница 52: ...52 Indication of main parameters mode...
Страница 53: ...53 Check mode...
Страница 54: ...54 Setup mode...
Страница 55: ...55 Setup Set zero mode Setup PS parameters mode...
Страница 56: ...56 Setup Pressures mode...
Страница 61: ...61 Schematic of device cable...
Страница 62: ...62 Pinout of connectors...
Страница 64: ...64 Appendix L Overall and connecting dimensions for flow measurement sections FS...
Страница 65: ...65 Overall and connecting dimensions for FS 32...
Страница 66: ...66 FS of DN 50 80 FS of DN 100 150...