SPECIFICATIONS

Range:

LU75: 2" to 4'
(5 cm to 1.2m)
LU72: 4" to 9.8'
(10 cm to 3m)
LU71: 4" to 16.4'
(10 cm to 5m)
LU73: 8" to 26.2'
(20 cm to 8m)

Repeatability:

0.25" (6 mm)

Adjustability:

Over entire range

Hysteresis:

LU72/5: 0.5" (1.2 cm)
(single set point)
LU71/3: 1" (2.5 cm)
(single set point)

Beam width:

LU72/5: 2" (5 cm) dia.
LU71/3: 3" (7.6 cm) dia.

Dead band:

LU75: 2" (5 cm)
LU71/2: 4" (10 cm)
LU73: 8" (20 cm)

LED indication:

Power, relay and echo status

Calibration:

Target, push button

Memory:

Non-volatile

Supply voltage:

50_5: 95-250 VAC
58_5: 12-28 VDC

Consumption:

50_5: 20 watts max.
58_5: 100 mA @ 24 VDC 

Contact type:

(3) SPDT relays

Contact rating:

60 VA

Contact logic:

Single point: alarm
Two point: latching or
out of bounds alarms
Duplex or Alternation:
(Relays 1 and 2 only)

Contact fail-safety:

De-energizes during echo signal loss

Process temp.:

F: -4° to 140°
C: -20° to 60°

Temp. comp.:

Automatic

Electronics temp.:

F: -40° to 160°
C: -40° to 71°

Pressure:

30 psi (2 bar) @ 25° C., derated @ 
1.667 psi (.113 bar) per °C. above
25° C.

Enclosure rating:

NEMA 4X (IP65)

Enclosure vent:

Water tight membrane

Encl. material:

PC/ABS FR

Trans. material:

PVDF Kynar®

Process mount:

LU72/5: 1" NPT (1" G)
LU71/3: 2" NPT (2" G) 

Mount. gasket:

Viton®

Conduit entrance:

Dual, 1/2" NPT

Classification:

General purpose

CE compliance:

EN 61326 EMC

(pending)

EN 61010 safety

1.2"

(32 mm)

1.9" 

(49 mm)

3.9" 

(100 mm)

5.2"

 (133 mm)

2.4" 

(62 mm)

1" NPT

 (1" G)

0.75"

(19 mm)

LU75

LU72

2.5"

(63 mm)

4.5" 

(1

14 mm)

5.2"

 (133 mm)

3.0"

(76 mm)

2" NPT

(2" G)

1.7"

(44 mm)

4.1"

 (104 mm)

5.2"

 (133 mm)

3.8"

 (96 mm)

40

30

 

20

 10

 00

-40

-20

00

20

40

60

80

Acceptable

Range

Unacceptable

Range

Temperature/Pressure Derating

Operating Pressure (psi)

Temperature (C¡)

LU71-5_ _5
LU73-5_ _5

Enclosure

Side View

LU75-5 _ _5
LU72-5 _ _5

Enclosure

Side View

LU7_-5 _ _5

Enclosure

Top View

Содержание EchoSwitch LU71

Страница 1: ...se of any product returned to Flowline where a There is evidence of a potentially hazardous material present with product b The product has remained unclaimed at Flowline for longer than 30 days after...

Страница 2: ...safety De energizes during echo signal loss Process temp F 4 to 140 C 20 to 60 Temp comp Automatic Electronics temp F 40 to 160 C 40 to 71 Pressure 30 psi 2 bar 25 C derated 1 667 psi 113 bar per C ab...

Страница 3: ...l Switch from FLOWLINE Please refer to the part number located on the switch label to verify the exact model configuration which you have purchased User s Responsibility for Safety FLOWLINE manufac tu...

Страница 4: ...nergize set point both relays will energize until the level reaches the de energize set point Alternation will automati cally fill or empty the tank with two pumps switching after each cycle PREPARATI...

Страница 5: ...olid you may either re pro gram the channel with new set points or leave it inactive PROGRAMMING Set Point Calibration Box Insert Table Target Wall Tape Distance Set Point Cal Run High Low Select Echo...

Страница 6: ...Low Level Out of Bounds Alarm Programming High Set Point Distance Low Set Point Distance Energize Energize De energize Out of Bounds D Programming Automatic Fill After having powered the switch with...

Страница 7: ...Eleven PROGRAMMING Programming Duplexing Pump Control After having pow ered the switch with the appropriate supply voltage entered the CAL mode selected relay channel 1 and erased any previously inpu...

Страница 8: ...process conditions prior to system start up Gasket Flange on Riser Height Inner Diameter Riser Bracket Stand Pipe Dead Band Ventilation Hole Operational Range Highest Liquid Level Lowest Liquid Level...

Страница 9: ...acoustic signal strength Read the Maximum Applied Range Step 4 E and consider rein stalling the switch in a Stand Pipe Step 11 A 4 to dampen turbulence and or separate the point of measurement from s...

Страница 10: ...ackup Primary Stop Duplexing Control Operation Alternating Control Operation OPERATION Step Sixteen Relay X Energize De Energize Start Stop Automatic Empty Operation Automatic Fill Operation Out of Bo...

Отзывы: