Flotec FP400C Скачать руководство пользователя страница 2

2

;

y

y

y

;;

yyy

yy

y

y

 

4       

1

3B

5

3A (2 places)

2

3

3A

3F

Key

Part

No.

Description

Qty.

FP400C

1

Sewage Basin

1

FPW73-15

2

Sewage Pump

1

FPSE3200A

3

Sewage Basin Cover (Includes 

Fittings Package PW73-43)

1

FPW73-17P

3A

2” Grommet, (Discharge and 

Vent Grommets)

2

*

3B

Cord Grommet

1

*

3C

Foam Gasket Seal 

w/Adhesive Backing (#)

6 Ft.

*

3D

Bolts, 1/4-20 x 1” (#)

4

*

3E

Washers, 5/16” (#)

4

*

3F

4” Inlet Hub

1

4

Check Valve, 2” Swing PVC

1

FPW212-4

5

Properly Grounded Outlet

(†)

REPAIR PARTS

8.  Set the pump and pipe down into the basin.

9. Install the rubber discharge grommet into the basin cover.

Lubricate the grommet with dish soap and slide the cover
down over the discharge pipe. If necessary, file the sharp
edges of the pipe.

10. Pull the power cords up, through the center electric cord

hole and Install the electric cord grommet, into the cover. 

11. Install the rubber vent pipe grommet into the vent hole, in

the cover. Slide the 2” vent pipe 2 inches into the hole.
The vent pipe must go through the roof of the building or
it can be connected to an existing vent pipe. The sewage
basin must be vented.

NOTICE: 

Bolt the lid to the basin. Do this before the con-

crete floor is poured. This will prevent wet concrete from
filling up your bolt holes and keep the basin from warping.

12. Install a 2” check valve in the horizontal portion of the

discharge pipe. See Figure 1. Make certain, the flow indi-
cating arrow, points away from the pump. This check
valve will keep the water from running back into the
basin when the pump is not running.

13. Double check the connection between the discharge pipe

and the septic or sewage tank. They must be connected
before the pump is plugged in.

14. Insert the float switch piggy-back plug into the properly

grounded outlet.

15. Plug the pump into the piggy-back plug.

16. Check the operation by filling the sump basin with water

and observing pump operation through one complete
cycle.

Failure to make this operational check may

lead to improper operation, premature failure, and flooding.

Explosion hazard.

Improper ventilation of

sewer gases can result in leakage of methane sewer gas, and a
possible explosion of fumes, resulting in severe injury or
death. Vent basin according to all local codes.

NOTICE:

Proper ventilation is also needed to prevent negative

basin pressure and to provide the necessary air for proper aer-
obic activity within the basin.

MAINTENANCE

The sump basin and cover, pump, and piping should be pro-
tected from freezing temperatures. If there is any danger of
freezing temperatures, the unit should be drained. Consult
your pump manual for instructions on how to drain the pump
to protect it from freezing.

NOTE: No replacement parts available. Do not install basin or
pump in any location classified as hazardous by the United
States National Electrical Code (NEC), or by the Canadian
Electrical Code (CEC), where applicable.

(#) Not Illustrated.
(*) Included in Fittings Package, Part Number PW73-43.
(†) Not available.

Содержание FP400C

Страница 1: ...NOTICE Proper ventilation is needed to prevent negative basin pressure and to provide air for proper aerobic activity within the basin The sewage basin should be located at the lowest place in the bas...

Страница 2: ...cating arrow points away from the pump This check valve will keep the water from running back into the basin when the pump is not running 13 Double check the connection between the discharge pipe and...

Страница 3: ...e pumps that have seen service and been removed carry a contamination hazard with them If your sewage pump has failed Wear rubber gloves when handling the pump For warranty purposes return the pump s...

Страница 4: ...ble pour emp cher qu une pression n gative ne se forme dans le bassin et pour un apport d air n cessaire l activit a robie dans le bassin Le bassin doit tre plac l endroit le plus bas du sous sol ou d...

Страница 5: ...ssin d eau et en observant le fonctionnement de la pompe pendant un cycle complet Ne pas proc der cette v rification de fonc tionnement risque de provoquer un mauvais fonctionnement une panne pr matur...

Страница 6: ...un risque de contamination En cas de d faillance de la pompe d eaux d gout Porter des gants en caoutchouc pour manipuler la pompe des fins de garantie retourner l tiquette figurant sur le cordon de la...

Страница 7: ...Ventile la cubeta de acuerdo a todos los c digos locales AVISO Se necesita ventilaci n adecuada para evitar una presi n negativa en la cubeta y proporcionar el aire necesario para la actividad aer bic...

Страница 8: ...to de la bomba por un ciclo completo Si se omite esta verificaci n opera cional existe el riesgo de que ocurra un funcionamiento inade cuado una falla prematura e inundaciones Peligro de explosi n La...

Страница 9: ...de Atenci n al Cliente de FLOTEC Las bombas cloacales que hayan estado en servicio y se hayan removido pueden representar un peligro de contaminaci n Si su bomba cloacal ha fallado Use guantes de cauc...

Отзывы: