background image

Step 3

03

Step 4

04

Step 6

C

x8

F

4x4

Install the Feet

C

F

1

2

Place the feet(1) on the bottom of the lifting column(2).
Fix the feet using screws(C) with Allen Key(F).

E

x12

Install the Tabletop

F

4x4

2

1

E

E

The expansion distance of the 
supporting beam can be adjusted 
according to the actual use.

When the supporting beam is greater than 

67.7"

, the 

installation method is as follows: Method 2 in Step 6.

Loosen

Adjust

Tighten

Step 5

7

AC

HS M1 M2

8

DC

Port for 
hand switch

Power port

Port for cable
connected to the
lifting column

Install the Cable Management Tray

B

x4

F

4x4

1

2

3

3

4

B

Method 1

Tighten

Buckle the other side

Slide one side

Firstly, rotate the screws (B) incompletely into the supporting beam (4)
with Allen Key (F), which means do not tighten them. Next, slide one
side of the cable management tray (3) into the screws (B), then the
other side. Finally, tighten the screws (B) with Allen Key (F).

B

x4

F

4x4

D

x4

3

4

D

B

B

D

Method 2

Install the cable management tray as Method 1, Step 6.

When the supporting beam stretches over 

67.7

", 

the cable management tray needs to be mounted on 
the middle of the supporting beam.

Do not stretch the support 
beam beyond this hole

Port for 
hand switch