7. INSTALLATION
Suspending the unit
The units are suspended on the ceiling using 4 rods with M8 thread. Spacing of fastening rods is
provided in the figure.
Rods should be screwed into rivet nuts of the unit for the depth of min 15 mm (rods can be
screwed for the max depth of ~25 mm).
When the unit needs to be suspended on a partition, e.g. of metal sheet, use stiffening
sections to avoid partition vibrations due to the unit operation, and prevent increase of
the noise in the compartment.
Minimum distance of the heating and cooling unit from the ceiling is 20 cm.