3. LA BAIGNOIRE DOIT ÊTRE TESTÉE
Avant de terminer l’installation, la baignoire doit être testée ; remplir la baignoire jusqu’au trop-plein et vérifier s’il y a des
fuites. S’assurer que les raccords des tuyaux au moteur sont bien serrés (serrer à la main seulement).
3. OBLIGATORY TEST
The bathtub must be tested before installation is completed. Fill the tub to the overflow and inspect for leaks. Tighten any
loose connections between the hoses by hand.
4
Appliquer un joint de silicone sous la baignoire.
Apply a silicone seal underneath the bathtub.
2. LEVELING
Once the unit is in position, ensure it is level adjusted in both directions for proper draining. Leveling must be done with the
adjustable feet located beneath the unit. Once the bathtub is in the desired position, adjust the feet so that they are ¼"
[6 mm] above the bottom rim of the bathtub, the bath weight should be taken by the feet not the surround.