background image

2

ABAL3660

● 

Table des matières

IMPORTANT .................................................... 2
L’ENTRETIEN DE VOTRE BASE DE DOUCHE ................ 2
SPÉCIFICATION. ............................................... 3
OUTILS ET MATÉRIAUX REQUIS. ............................. 3
TYPE D’INSTALLATION. ....................................... 4
1. INSTALLEZ LE BRIDE DE CARRELAGE. ................... 5
2. PRÉPAREZ LA PLOMBERIE D’ÉVACUATION. ............. 6
3. INSTALLEZ LE DRAIN. ..................................... 7
4. NIVELEZ LA BASE. ......................................... 7
5. TESTEZ LE DRAINAGE. .................................... 8
6. FIXEZ LA BASE. ............................................. 8
7. FIXEZ LA BASE (SUITE). ................................... 9
8. FINITION. .................................................. 10

● 

IMPORTANT

-  Lire attentivement et complètement le manuel 

  d’installation avant de procéder.

-  Il est recommandé de porter des lunettes de sécurité en 

    tout temps lors de l’installation.

-   Avant l’installation de la base, toute l’ossature et la    

  plomberie doivent être complétées conformément  

  aux instructions.

  S’il s’agit de travaux de rénovation, les surfaces murales  

  existantes doivent être enlevées pour installer l’ossature  

 appropriée.

  Les murs extérieurs doivent être isolés adéquatement    

  et inclure un coupe-vapeur conformément aux codes  

  du bâtiment.

● 

L’entretien de votre base de douche

-   Pour protéger le fini de votre base, n’utilisez    

 

  jamais de poudre ou tampons de récurage ou d’autres    

  solvants forts. Nettoyez seulement avec une solution    

  d’eau et détergent doux. 

 

Des changements peuvent être apportés au 

produit sans préavis.  Veuillez donc utiliser les 

instructions fournies avec le produit.

● 

Table of Contents

IMPORTANT .................................................... 2
CARE FOR YOUR ARIA STONE SHOWER BASE .............. 2
SPECIFICATION. ............................................... 3
TOOLS AND MATERIALS REQUIRED. ........................ 3
TYPE OF INSTALLATION. ..................................... 4
1. INSTALL TILING FLANGE. ................................. 5
2. PREPARE DRAINING PIPE. ................................. 6
3. INSTALL THE DRAIN. ...................................... 7
4. LEVELING THE BASE. ...................................... 7
5. TESTING THE DRAINAGE. ................................. 8
6. SECURING THE BASE. ..................................... 8
7. SECURING THE BASE. (CONTINUED) .................... 9
8. FINISHING. ................................................. 10

-    Read this manual carefully and completely before  

 

proceeding.

-    It is recommended that you wear safety glasses at all times 

during the installation.

-    Prior to installation of base, all framing and plumbing  

work must be completed in accordance with this 

instruction sheet. For renovation work, existing  

shower surfaces must be removed to accommodate 

framing requirements. Ensure that outer wall are properly 

insulated, and that a vapor barrier has been installed in 

accordance with established building codes.

● 

Care for your shower base

-    In order to protect the surface of your base, never use 

scouring powder pads or other strong solvent. Only clean 

with a mild detergent diluted in water.

Product specifications are subject to change 

without notice. Use the installation instructions 

supplied with the product.

● 

IMPORTANT

Содержание ABAL3660

Страница 1: ...05 2013 Mod le Model ABAL3660 GUIDE D INSTALLATION INSTALLATION MANUAL Base de Douche Shower Base Patent US D678 488 S...

Страница 2: ...d tergent doux Des changements peuvent tre apport s au produit sans pr avis Veuillez donc utiliser les instructions fournies avec le produit Table of Contents IMPORTANT 2 CARE FOR YOUR ARIA STONE SHO...

Страница 3: ...DRAIN 20 3 4 527mm 1 25mm 16 406mm 17 432mm 2 3 4 70mm 60 1524mm 36 914mm 6 5 8 168mm 18 457mm 83mm 3 1 4 3 5 8 92mm 3 5 8 92mm Mur fini Finished wall 1 254mm 1 254mm 1 254mm Bride de carrelage Tile...

Страница 4: ...E OF INSTALLATION SEUIL SIMPLE SINGLE THRESHOLD SEUIL DOUBLE DOUBLE THRESHOLD Drain c t droit Right side drain Drain c t gauche Left side drain Drain c t droit Right side drain Drain c t gauche Left s...

Страница 5: ...silicone sealant along the channel Also apply a small bead of silicone sealant under the corner flange as shown INSTALLEZ LA BRIDE DE CARRELAGE INSTALL TILING FLANGE 1B Installez les brides de carrela...

Страница 6: ...your base for final dimensions 2B Positionnez la base en place V rifiez que l emplacement de la plomberie d vacuation est align avec le drain de la base Enlevez la base Position base Verify that the d...

Страница 7: ...pour l assemblage Components might vary according to the model of drain used Refer to manufacturer s instructions for the proper installation Pommelle Strainer Couvre drain d coratif Drain cover Corps...

Страница 8: ...rifiez que l coulement de la base se fasse correctement il ne doit pas y avoir d accumulation de flaque d eau dans la base Unplug the drain and assure that the drainage is efficient There must be no p...

Страница 9: ...ides de carrelage et les coudes de raccordement Apply silicone sealant along the intersection of the two tile flanges and corner flange 6 FIXEZ LA BASE SUITE SECURING THE BASE CONTINUED Applicable seu...

Страница 10: ...ur une finition tanche d aspect professionnel Tips to achieve a professional looking and watertight finish Bride de carrelage en T Tee section tiling flange Panneau de b ton Cement board Scellant Sili...

Отзывы: