1.6 INITIAL ASSEMBLY
Remove all components from the bag which was attached to the machine on delivery.
Slacken the bolts which attach the A frame to the frame of the topper, reposition the A frame into a vertical position
and retighten the bolts.
Attach the large D-shackle to the eye on the back of the A frame.
Attach one end of the chain to the eye(s) on the rear of the topper.
For the 4’, 5’ and 6’ Topper, feed the chain through the large D-shackle and use the final small D-shackle to attach
the remaining end of the chain to the other eye on the rear of the machine.
Ensure the chain does not cross over itself and is free to travel through the large D-shackle.
On the 3’, 4’ and 5’ models, the lift arm pins must be attached to the frame of the topper. Pass the threaded part of
the pins through the holes in the frame of the topper, in the area below the A frame. Ensure the threaded parts of
the pins face towards each other.
Ensure the spring washers are located under the nuts and the nuts are fully tightened.
1
FLAIL CARRIER
11
4
M14 X 50 BOLT
10
2
M24 X 50 BOLT
9
2
8
2
M24 LOCKNUT
7
1
ROTOR BAR HOLDER
6
4
M14 LOCKNUTS
5
4
M16 X 50 BOLT
4
1
MAIN CHASSIS
3
1
GEARBOX
2
4
M16 LOCKNUT
1
QTY
DESCRIPTION
ITEM
PARTS LIST FOR FIGURE ON NEXT PAGE
RIGHT HAND FLAIL
Содержание TOP3
Страница 6: ......