36
CIP - Phase 3: Reassembly
23. Connect each Syrup Bag Adapter to the
syrup bag fitments. (See Figure 72.)
26071
Figure 72
24. Hold the base of the adapter and turn the
adapter valve toward the syrup line. (See
Figure 73.)
26277
Figure 73
25. Reconnect each syrup line and bag of syrup
by pressing the Syrup Bag Connector onto
the Syrup Bag Adapter valve. (See
Figure 74.)
26275
Figure 74
26. Remove the Syrup Line Manifold, Manifold
cap, the Duckbill Check Valve, and Coupler
Body from the sanitizer solution and place
on a sanitary tray to air dry. (See
Figure 75.)
26091
Figure 75
27. Install the Duckbill Check Valve into the
Syrup Line Manifold and the Syrup Line
Manifold into the Coupler Body. (See
Figure 76.)
26176
Figure 76
28. Remove the end of the 9-Tube Assembly
from the container. Using a spray bottle of
approved sanitizer solution, spray end of the
assembly and allow it to sanitize for at least
1 minute. (See Figure 77.)
Figure 77
Содержание FB 80D Series
Страница 5: ...4 General System Overview 13 2 1 3 5 6 15 14 10 8 11 12 9 7 17 16 4 26000 Figure 1...
Страница 7: ...6 Outer Cabinet 3 1 2 12 10 7 13 4 5 9 8 6 11 26001 Figure 2...
Страница 9: ...8 Inner Cabinet 26002 15 11 13 16 14 11 12 1 9 2 6 6 11 18 19 16 4 5 3 4 17 11 8 10 7 Figure 3...
Страница 17: ...16 Remote Module and Electronic Parts 4A 4 4B 4C 1 2 3 5 5 6 7 8 REVERSE SIDE 9 10 26006 Figure 7...
Страница 19: ...18 Maintenance Kit and Spare Parts Kit 1 2 1D 2I 2C 1A 2A 2B 2D 2E 2F 2H 2K 2J 2L 1C 1B 2M 2G 2N 26007 Figure 8...
Страница 20: ...19...
Страница 24: ...23...
Страница 32: ...31...
Страница 62: ...61...
Страница 72: ...71...