CONTENTS
PAGE
Section 1
Information and Requirements
1.0
Appliance information
3
1.1
Conditions of installation
4
1.2
Flue & Chimney Suitability
4
1.3
Shelf position
5
1.4
Hearths
5
1.5
Installation to plastered wall surfaces
5
Section 2
Installation of Fire
2.1
Unpacking the combustion chamber
6
2.2
Preparing the combustion chamber opening (In studded wall)
7
2.3
Preparing the combustion chamber opening (In chimney breast)
8-9
2.4
Securing the fire to the opening
10
2.5
Installation of the gas supply
11
2.6
Fitting the efficiency / flue restrictor baffle
12
2.7
Fitting the batteries to the fire
12
2.8
Removal & re-fitting of the glass frame
13
Section 3
Assembling Fuel Bed and Commissioning
3.1
Fitting the fuel bed logset
14-18
3.2
Making the gas connection & checking for gas tightness
18
3.3
Removal & re-fitting the trim
19
3.4
Fitting the batteries
20-21
3.5
Lighting the fire manually
21
3.6
Lighting the fire via the remote control handset
22-23
3.7
Checking for clearance of combustion products
24
Section 4
Maintenance
4.1
Removal of the burner assembly
25
4.2
Removal of the control valve
25-26
4.3
Removal of the pilot assembly
26
Section 5
User Instructions
5.1
Installation Information
27
5.2
About the Rocco HE room heater
28
5.3
Spillage monitoring system
28
5.4
Operating the Fire
29-30
5.5
Manual operation of the fire
32-33
5.6
Replacing the batteries
33
5.7
Cleaning instructions
34
5.8
Removal & re-fitting the fuel-bed logset
35-39
5.9
Removal & re-fitting the glass frame
40
5.10
Removal & re-fitting the trim assembly
41
5.11
User replaceable parts
45
Model number FPHL**RN2
manufactured by:-
BFM Europe Ltd. Trentham Lakes, Stoke-on-Trent, Staffordshire, ST4 4TJ
2