We reserve the right to change designs and technical specifications of our products.
Manual ENA 7-30
29
28
ENG
3.2. Parameter menu
Item
Factory setting
Duration of turbo
- Remaining fast run time up to automatic change to normal mode
10 hours
Pause normal degaz
- Duration of pause between end of evacuation time and beginning of
pump run
15 minutes
- Pause ON (beginning of night pause)
06:00 pm
- Pause OFF (end of night pause)
08:00 am
Degassing
- Pump run time
Pressure dependent [s]
- De-aeration time
60 seconds
System pressure
- pON: depending on the system type
ENA 7 -> 1.5 bar
ENA 10 -> 1.5 bar
ENA 20 -> 3.0 bar
ENA 30 -> 5.0 bar
- pOFF: depending on the system type
ENA 7 -> 2.0 bar
ENA 10 -> 2.0 bar
ENA 20 -> 4.0 bar
ENA 30 -> 6.0 bar
- Lower pressure limit (lower working pressure limit)
Depending on the
system type
- Upper pressure limit (upper working pressure limit)
Depending on the
system type
- Special system pressure (irrelevant for the operator)
Factory setting
Litres counter
- Litre/pulse: pulse water meter (can be set only by service personnel)
10 litre/pulse
- Error litres counter: monitoring of delay of cycle of litres counter
40 minutes
Water treatment
100 litres
- Treatment capacity in case of integrated water softening module
100 litres
Filling quantity:
Based on a continually referenced preceding period of time (time window), the unit allows using a
certain number of filling cycles that are separated by pauses from one another. Cycles, pauses and
time windows (time spending) can be freely parameterised.
Example: (default setting)
In the last 480 minutes (time spending) the make-up water quantity per cycle must not exceed 50 litres.
Moreover, it is not permissible to supply this quantity during this time more than three times, and the
pauses between the cycles must be 5 minutes at a minimum.
Item
Factory setting
Max quantity/filling
- Maximum allowable quantity per cycle (also per cycle) with integrated
and
configured pulse water meter. See section Monitoring: make-up quantity
150 litres
Max time/filling
- Maximum allowable make-up time per cycle (also per cycle). See section
Monitoring: monitoring of run time
20 minutes
Min. interval betw. 2 cycles
- Minimum interval between two cycles (pause)
5.0 minutes
Max cycles/time spend
- Maximum number of cycles per time window
3
Time spending
- Size of time window
480 minutes
Item
Factory setting
Time and date
Operator task
- Summer time on: starting month (summer time ON is 00 for regions
without change between times)
03
- Summer time off: ending month (summer time OFF=00 for regions
without change between times)
10
- Maintenance gap: maintenance interval 0 .. 800 days
365 days
- Pressure sensor min.value
0.0 bar
- Pressure sensor max.value
10.0 bar
Note that the values in the filling quantity menu are interdependent. Therefore, it may be necessary
to first parameterise another value before the actual value becomes accessible within the intended
limits. Similarly, setting ranges may be limited by the dependencies. It is advisable, for instance, to
first parameterise a sufficiently sized time window before defining the pauses and the number and
length of cycles
3.3. Service menu
Project number
Factory settings; not be programmed by the operator.
Software version
Readable entry made by manufacturer.
Start
Enter the time and date of the start (traceability) by pressing Start. Before pressing, the date and time
must have been correctly set.
Maintenance
The date of the next maintenance is indicated in parentheses. When this time is reached, the
centralised fault alarm is optionally tripped, and a fault message is displayed to remind the operator.
If it is acknowledged, it will be displayed again after seven days unless ‘Maintenance done’ has been
pressed, thus indicating that the maintenance has already been carried out. The time and date of the
last maintenance as well as the code level are indicated in the upper two lines.