Flaman Fitness Deluxe X12103 Скачать руководство пользователя страница 11

clim

BiNg

 Pole

StEp 7 – Attach spinning Bead Wall to Platform F2

sTeP 7a – attach ring clamps to spinning Bead Wall

Loosely, fasten (1) Ring Attachment Clamp Top EE and (1) 

Bottom DD to one end of the top of Spinning Bead Wall P1 

using (2) Ring Bolts W and (2) Ring Nuts X. Repeat for other 

top side of Wall P1. 

sTeP 7B – attach spinning Bead Wall to Platform f2

Fasten the clamps on the top of Wall P1 to Attachment Rings 

on Poles C and E1 that are 

86.5” from the ground.

 Insert 

(3) Bolts Z, (3) Washer HH through Second Platform F from 

underneath into Pre-Threaded Posts of Wall P1. Tighten all 

Bolts in this step.

imPorTaNT!

Tighten all bolts in this step  

before moving on to step 8

pArtS

Spinning Bead Wall P1

(2) Ring Clamp EE & DD

(4) Bolt W

(4) Nut X

(3) Bolt Z

(3) Washer HH

sTeP 7B

sTeP 7a

f2

e1

d

e2

h

P

Bead

Wall

sTe

P h

 / P

laT

form

 f1

44”

44”

44”

c

86.5”

86.5”

Содержание Deluxe X12103

Страница 1: ...ASSEMBLY The Deluxe Playground Model X12103 Please note The swing bay is an available option for residential use only...

Страница 2: ...T Climbing Pole 1 Piece U Roof 1 Piece V Stairs 1 Piece The Parts W x Ring Bolts 28 Pieces X Ring Nuts 28 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces...

Страница 3: ...around the pole Depending on the pole there will be 2 or 3 Attachment Rings There are two types of Poles Poles A B C and D will also have a bracket on the top to secure the roof to Poles E1 and E2 wil...

Страница 4: ...ces bag may include more Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces AA 3 8 Platform Railing nuts 18 Pieces X Ring Nuts 28 Pieces HH 3 8 Washers 48 Pieces JJ...

Страница 5: ...tioning and inserting 1 Bolt Z 2 Washer HH and 1 Nut AA into Platform Ring 32 high on Pole C to attach it to Platform F Have a person hold Pole C while attaching the last open corner of Platform F to...

Страница 6: ...using 2 Ring Bolts W and 2 Ring Nuts X Repeat for Second Step Railing K Now Attach 1 Stair Railing K with Clamps EE and DD to Attachment Ring on Pole A 75 from the Ground Fasten Second Railing K with...

Страница 7: ...sing 2 Ring Bolts W and 2 Ring Nuts X Repeat for other three ends of Slide Roof R STEP 3C Attach slide roof to poles B D Fasten the clamps on the Bottom sides of Slide Roof R to Attachment Rings on Po...

Страница 8: ...between Poles C and D using 3 Bolts Z 6 Washers HH and 3 Nuts AA Order bolt washer step platform washer nut Do not tighten bolts until the end of step 5 important Do not tighten bolts until the end of...

Страница 9: ...olt Z 2 Washers HH and 1 Nut AA Order bolt washer platform ring washer nut Attach Pole E2 on the open corner that is on the same side as Pole D with 1 Bolt Z 2 Washers HH and 1 Nut AA Order bolt washe...

Страница 10: ...g Nuts X STEP 6B Attach Railing J to Platform F1 Place Railing J between Poles A and B and fasten Clamp pieces EE and DD to the Attachment Rings at 75 from the ground on Pole A and Pole B Attach botto...

Страница 11: ...Spinning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P1 to Attachment Rings on Poles C and E1 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F fro...

Страница 12: ...round Use 2 Bolt Y 4 Washer HH and 2 Nut AA Order bolt washer railing platform washer nut to secure Railing to Platform F2 STEP 8C Insert Climbing Pole T Loosen the Allen Key Bolt on the top piece of...

Страница 13: ...ning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P2 to Attachment Rings on Poles E1 and E2 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F from u...

Страница 14: ...g Screw GG and 2 Short Self Tapping Screws FF at each post through the brackets on the tops of Posts A B C and D and into the Plastic Roof important If people assembling roof are not tall enough you w...

Отзывы: