Flaman Fitness Deluxe X12103 Скачать руководство пользователя страница 10

StEp 6 – Attach Railing J to Platform F1

sTeP 6a – attach ring clamps to railing J

Loosely, fasten (1) Ring Attachment Clamp Top EE and (1) 

Bottom DD to one of the top sides of Railing J using (2) Ring 

Bolts W and (2) Ring Nuts X.  Repeat for the other side of 

Railing J with (1) Ring Attachment Clamp Top EE and (1) 

Bottom DD, (2) Ring Bolts W and (2) Ring Nuts X.

sTeP 6B – attach railing J to Platform f1

Place Railing J between Poles A and B and fasten Clamp 

pieces EE and DD to the Attachment Rings at 

75” from the 

ground

 on Pole A and Pole B.  Attach bottom of Railing J to 

Platform F using (2) Bolts Y, (4) Washers HH, and (2) Nuts 

AA 

(Order: Bolt, washer, platform/ring, washer, nut).

 

imPorTaNT!

Tighten all bolts in this step before moving on to step 7

pArtS

Railing J

(2) Ring Clamp EE & DD

(4) Bolt W

(4) Nut X

(2) Bolt Y

(2) Nut AA

(4) Washer HH

sTeP 6B

sTeP 6a

B

d

c

a

sTEP 6A

sTEP 6B

J

sTair

 V

f1

32”

32”

32”

75”

75”

Содержание Deluxe X12103

Страница 1: ...ASSEMBLY The Deluxe Playground Model X12103 Please note The swing bay is an available option for residential use only...

Страница 2: ...T Climbing Pole 1 Piece U Roof 1 Piece V Stairs 1 Piece The Parts W x Ring Bolts 28 Pieces X Ring Nuts 28 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces...

Страница 3: ...around the pole Depending on the pole there will be 2 or 3 Attachment Rings There are two types of Poles Poles A B C and D will also have a bracket on the top to secure the roof to Poles E1 and E2 wil...

Страница 4: ...ces bag may include more Z 1 5 x 3 8 Platform Railing Bolts 24 Pieces Y 1 x 3 8 Platform Railing bolts 6 Pieces AA 3 8 Platform Railing nuts 18 Pieces X Ring Nuts 28 Pieces HH 3 8 Washers 48 Pieces JJ...

Страница 5: ...tioning and inserting 1 Bolt Z 2 Washer HH and 1 Nut AA into Platform Ring 32 high on Pole C to attach it to Platform F Have a person hold Pole C while attaching the last open corner of Platform F to...

Страница 6: ...using 2 Ring Bolts W and 2 Ring Nuts X Repeat for Second Step Railing K Now Attach 1 Stair Railing K with Clamps EE and DD to Attachment Ring on Pole A 75 from the Ground Fasten Second Railing K with...

Страница 7: ...sing 2 Ring Bolts W and 2 Ring Nuts X Repeat for other three ends of Slide Roof R STEP 3C Attach slide roof to poles B D Fasten the clamps on the Bottom sides of Slide Roof R to Attachment Rings on Po...

Страница 8: ...between Poles C and D using 3 Bolts Z 6 Washers HH and 3 Nuts AA Order bolt washer step platform washer nut Do not tighten bolts until the end of step 5 important Do not tighten bolts until the end of...

Страница 9: ...olt Z 2 Washers HH and 1 Nut AA Order bolt washer platform ring washer nut Attach Pole E2 on the open corner that is on the same side as Pole D with 1 Bolt Z 2 Washers HH and 1 Nut AA Order bolt washe...

Страница 10: ...g Nuts X STEP 6B Attach Railing J to Platform F1 Place Railing J between Poles A and B and fasten Clamp pieces EE and DD to the Attachment Rings at 75 from the ground on Pole A and Pole B Attach botto...

Страница 11: ...Spinning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P1 to Attachment Rings on Poles C and E1 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F fro...

Страница 12: ...round Use 2 Bolt Y 4 Washer HH and 2 Nut AA Order bolt washer railing platform washer nut to secure Railing to Platform F2 STEP 8C Insert Climbing Pole T Loosen the Allen Key Bolt on the top piece of...

Страница 13: ...ning Bead Wall to Platform F2 Fasten the clamps on the top of Wall P2 to Attachment Rings on Poles E1 and E2 that are 86 5 from the ground Insert 3 Bolts Z 3 Washer HH through Second Platform F from u...

Страница 14: ...g Screw GG and 2 Short Self Tapping Screws FF at each post through the brackets on the tops of Posts A B C and D and into the Plastic Roof important If people assembling roof are not tall enough you w...

Отзывы: