EN
EN
10
4 INFLATING AND SETTING UP
NOTE!
Tighten the valves before inflating!
Valve and pump operation
1. The valves must be closed when inflating: the
button in the middle is in up position. By pressing
the button you can open/close the valve. Button
down = valve open, button up = valve closed.
2. The FitNord pump is a Double Action Pump.
Initially, you can keep the plug closed allowing the
pump to push air into the board during both the
pulling and pushing phases. When the pressure
rises and the pumping becomes heavier, open
the plug which makes the pumping easier (single
action mode).
All
three
valves must be tightened before the first
inflation. If the valve is loose, air will leak from the
outer edges of the valve and the kayak will deflate.
Tighten the valve with the wrench tool included in
the repair kit. Note that the kayak must be empty
when tightening. Insert the wrench into the slots
around the valve, press all the way down and
tighten firmly clockwise.
Содержание Seal One
Страница 2: ...REGARDS FROM THE FITNORD TEAM CONGRATULATIONS ON PURCHASING A FITNORD KAYAK ...
Страница 4: ...EN ...
Страница 18: ...DAS FITNORD TEAM WIR GRATULIEREN SIE FÜR DEN EINKAUF UNSERES KAJAKS ...
Страница 20: ...DE ...
Страница 35: ...DE 35 ...
Страница 36: ...CORDIALEMENT L ÉQUIPE FITNORD MERCI D AVOIR CHOISI UNE KAYAK FITNORD ...
Страница 38: ...FR ...
Страница 52: ...I MIGLIORI SALUTI DAL TEAM FITNORD CONGRATULAZIONI PER L ACQUISTO DI UN KAYAK FITNORD ...
Страница 54: ...IT ...
Страница 68: ...SALUDOS DEL EQUIPO DE FITNORD FELICITACIONES POR LA COMPRA DE UN KAYAK DE FITNORD ...
Страница 70: ...ES ...
Страница 84: ...SE ...