Get Started Assembling
Your New Exercise Bike
A s s e m b l y I n s t r u c t i o n s
Step #1 Install Stabilizers
Remove Main Frame (01) and all components and place on a clean durable surface. Note: most
mounting hardware is pre-installed for easy matching during assembly. Tools are provided
Unlock Main Frame (01) to “Open” position by pulling Frame Lock Pin (55) while pushing
lightly with foot on stabilizer, then release.
Install front (59) and rear (62) stabilizers to Main Frame (01) with hex cap nuts (61) and
curved washer (06), tighten securely. Rear Stabilizer has transport wheels.
STEP#1
STEP#2
MOUNTING HARDWARE IS LOCATED
ON PARTS THEY ARE TO BE INSTALLED
ON FOR EASY IDENTITY
Step #2 Install Pedals
Note: Left Pedal installs counter clockwise.
Install by rotating to LEFT. Use
care that Pedal Shaft is Perpendicular to Crank Shaft. Use supplied wrench to
tighten. Check pedals often for tightness when new.
Note:
Crank arms should be checked for tightness using 14mm socket after
first couple hours of use.
Important!
Make
Pedals
Extra
Tight !
Note: Pedals must be made extra tight. USE 5/8” Wrench and tap with Hammer till EXTRA Tight.
Содержание FDX 2.0 - 002
Страница 7: ...Detailed Parts List ...