![Fisher FSAI-SU-120AE2 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/fisher/fsai-su-120ae2/fsai-su-120ae2_service-manual_2294426050.webp)
50
Safety
Electricity power is still kept in capacitors even the power supply is shut off. Do not forget to discharge the electricity
power in capacitor.
Electrolytic Capacitors
(HIGH VOLTAGE! CAUTION!)
Connect discharge resistance (approx.100Ω 40W) or soldering iron (plug) between +, - terminals of the electrolytic
capacitor on the contrary side of the outdoor PCB.
Note: The picture above is only for reference. The plug of your side may be different.
Main parts check
1. Temperature sensor checking
Disconnect the temperature sensor from PCB, measure the resistance value with a tester.
Содержание FSAI-SU-120AE2
Страница 8: ...8 3 Dimension 3 1 Indoor Unit W D H Model W D H FSAI SU 90AE2 715 188 250 FSAI SU 120AE2 800 188 275 ...
Страница 12: ...12 4 2 Wiring Diagram Indoor unit FSAI SU 90AE2 FSAI SU 120AE2 Outdoor unit FSOAI SU 90AE2 ...
Страница 13: ...13 Outdoor unit FSOAI SU 120AE2 ...
Страница 25: ...25 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage ...
Страница 41: ...41 8 2 2 Indoor unit and outdoor unit communication protection error diagnosis and solution E1 ...
Страница 45: ...45 8 2 6 Refrigerant Leakage Detection diagnosis and solution EC ...
Страница 46: ...46 8 2 7 IPM malfunction or IGBT over strong current protection diagnosis and solution P0 ...
Страница 47: ...47 8 2 8 Over voltage or too low voltage protection diagnosis and solution P1 ...
Страница 48: ...48 8 2 9 High temperature protection of compressor top diagnosis and solution P2 ...
Страница 49: ...49 8 2 10 Inverter compressor drive error diagnosis and solution P4 ...