Fisher-Rosemount Design CV500 Скачать руководство пользователя страница 8

Design CV500

8

Packing Maintenance

Key numbers refer to figure 11 for 3 through 8-inch
sizes and to figure 12 for 10 and 12-inch sizes unless
otherwise indicated.

Note

For the ENVIRO-SEAL packing system,
refer to the Parts List section for retrofit
kits, parts kits, and individual parts (see
figures 13 and 14). Refer to separate
ENVIRO-SEAL instruction manual for
maintenance instructions.

Standard ENVIRO-SEAL packing
systems can be used in vacuum service
with packing rings in the standard
orientation. It is not necessary to reverse
the ENVIRO-SEAL PTFE packing rings.

Stopping Leakage

All maintenance procedures in this section may be
performed with the valve body (key 1) in the line.

For packings other than spring-loaded packing,
leakage around the packing follower (key 14) can be
stopped by tightening the packing flange nuts (key 16).
If leakage cannot be stopped in this manner, replace
the packing according to the Replacing Packing
procedure.

If the packing is relatively new and tight on the drive
shaft (key 3), and if tightening the packing nuts does
not stop leakage, it is possible that the shaft is worn or
nicked so that a seal cannot be made. If the leakage
comes from the outside diameter of the packing, it is
possible that the leakage is caused by nicks or
scratches on the packing box wall. Inspect the shaft
and packing box wall for nicks or scratches when
performing the following procedures.

Replacing Packing

Note

If the valve has ENVIRO-SEAL
live-loaded packing installed, see the
manual entitled ENVIRO-SEAL Packing
System for V-Line and edisc Rotary
Valves.

This procedure may be performed without removing
the actuator from the valve if adding
PTFE/composition packing rings as a temporary
measure. However, the actuator must be removed if
replacing any other kind of packing or if the metal
packing parts (keys 14, 17, and, if used, 18) need to
be replaced.

1.  Isolate the control valve from the line pressure,
release pressure from both sides of the valve body,
and drain the process media from both sides of the
valve. If using a power actuator, also shut-off all
pressure lines to the power actuator, release all
pressure from the actuator. Use lock-out procedures to
be sure that the above measures stay in effect while
you work on the equipment.

CAUTION

To avoid increased leakage, increased
valve component wear or possible
damage to the valve body, ball, shaft,
and bearings resulting from a sharp
blow to the shaft, use a wheel puller to
separate the actuator parts from the
drive shaft.

Do not drive the actuator parts off the
drive shaft since this could move the
valve bearings, shaft, and ball away from
proper alignment, causing improper
seating of the ball. Such misalignment
may result in damage to valve
components if the valve is returned to
service without disassembly and
inspection of the valve ball alignment.

2.  If necessary, remove the cap screws (key 25) and
hex nuts (key 26). Then remove the actuator while
referring to the actuator instruction manual for
assistance.

3.  Remove the packing nuts (key 16). For 3 through
8-inch sizes, remove the packing follower (key 14). For
10 and 12-inch sizes, remove the packing flange (key
45) and then remove the packing follower (key 14).

4.  Remove the old packing rings (key 13), packing
box ring (key 17), and, if used, the lantern ring (key
18). Do not scratch the valve shaft or packing box wall;
scratching these surfaces could cause leakage. Clean
all accessible metal parts and surfaces to remove
particles that would prevent the packing from sealing.

5.  Whenever you are installing new packing, be sure
the ball (key 2) is closed while you install and tighten
the new packing. Install the new packing rings and
packing box ring by stacking the parts as shown in
figure 6.  Make sure split rings are arranged so that the
splits do not line up to form a leak path. Then slide the
stack into the packing box as far as they will go while
being careful to avoid trapping air among the rings.

6.  Install the packing follower (key 14), and, for 10 and
12-inch sizes, also install the packing flange (key 45).
Install the nuts (key 16), and tighten them far enough
to stop leakage under normal conditions.

7.  Mount the actuator while referring to the actuator
mounting procedures in the actuator instruction

Содержание Design CV500

Страница 1: ...Direction 18 Changing Actuator Mounting Style 18 Parts Ordering 18 Parts Kits 18 Parts List 19 Introduction Scope of Manual This instruction manual provides installation operation maintenance and par...

Страница 2: ...ctuator rod opens valve body Shaft Diameters 2 and Approximate Weights See table 4 1 The pressure temperature limits in this manual and any applicable standard limitations should not be exceeded 2 Sha...

Страница 3: ...2 600 600 600 315 6 450 500 1 29_C 20_F for WCC steel valve body material 2 For hot water or steam service limit maximum temperature to 260_C 500_F 3 The pressure or temperature limits in this table...

Страница 4: ...e drive shaft horizontal and the Vee Ball closing in the downward direction for standard right hand mounting 6 Install the flange gaskets and insert the valve between the mating pipeline flanges For w...

Страница 5: ...R MOUNTING STYLE VALVE OPEN 1 2 3 4 NOTES 1 ARROW ON LEVER INDICATES DIRECTION OF ACTUATOR THRUST TO CLOSE VALVE 2 PDTC PUSH DOWN TO CLOSE PDTO PUSH DOWN TO OPEN 3 F FORWARD FLOW R REVERSE FLOW RIGHT...

Страница 6: ...DIN Qty Bolt Size Bolt Length mm Overall Length mm PN 10 40 4 M16 x 2 50 60 3 PN63 4 M20 x 2 5 60 73 3 PN100 4 M24 x 3 70 85 PN10 16 4 M16 x 2 50 60 4 PN25 40 4 M20 x 2 5 60 73 4 PN63 4 M24 x 3 70 85...

Страница 7: ...the retrofit kits listed in the parts kit sub section near the end of this manual Maintenance WARNING Avoid personal injury or property damage from sudden release of process pressure or bursting of pa...

Страница 8: ...ides of the valve If using a power actuator also shut off all pressure lines to the power actuator release all pressure from the actuator Use lock out procedures to be sure that the above measures sta...

Страница 9: ...ENT DOUBLE PACKING ARRANGEMENT PRESSURE SERVICE VACUUM SERVICE PRESSURE VACUUM SERVICE FOR PURGED BEARING CONSTRUCTION FOR PURGED BEARING CONSTRUCTION GRAPHITE RIBBON OR PTFE COMPOSITION PACKING PTFE...

Страница 10: ...ng or if seat ring inspection is necessary The actuator and valve must be removed from the pipeline however the actuator may remain mounted during this procedure Key numbers refer to figure 11 for 3 t...

Страница 11: ...re to a pneumatic actuator or other steps as appropriate When installing the seat ring keep hands tools and other objects out of the valve 1 Apply enough supply pressure to the actuator to open the ba...

Страница 12: ...otation keep tools and other property away from the edges of the ball When the actuator is removed from the valve the ball shaft assembly may suddenly rotate resulting in personal injury or property d...

Страница 13: ...groove pin key 39 that secures the ball key 2 to the follower shaft key 38 Remove the groove pin from the ball ear in the direction shown in figure 8 Using a pin punch and hammer firmly strike the cha...

Страница 14: ...inside the valve body on either side of the ball Only one of these two bearings is identified by key 6 The other bearing is located along the drive shaft on the other side of the V notch ball Figure 8...

Страница 15: ...for 10 and 12 inch sizes into the valve body and against the bearing stop 5 For 3 through 8 inch sizes inspect the drive shaft key 3 Insert the shaft end opposite the splined end into the packing box...

Страница 16: ...e drive shaft until the slash mark is vertical and facing out from the center of the shaft in the same direction as the ball seating surface See figure 10 Note When the valve drive shaft is correctly...

Страница 17: ...oved or disconnected from the valve and whenever the seat ring and retainer keys 4 and 5 are removed Too little actuator travel will increase shutoff leakage too much travel will cause excessive ball...

Страница 18: ...he procedure for changing actuator mounting style if the actuator must be repositioned and refer to the installation section to install the control valve assembly Be sure to reposition the flow direct...

Страница 19: ...ng Set Packing Set 1 1 106 Anti Extrusion Washer Anti Extrusion Washer 2 2 1 Order individual parts from the Parts List 2 Included in packing set key 105 Parts List Valve Body figures 11 and 12 1 Body...

Страница 20: ...aphite ribbon 1V949601652 Packing washer key 28 12B5927X012 14 Packing Follower 15 Packing Flange Stud 16 Packing Flange Nut 17 Packing Box Ring Use w all packing box constructions 316 SST 3 inch 16A6...

Страница 21: ...sign CV500 21 Figure 11 3 Through 8 Inch Design CV500 Valve 42B3374 A IL TCM SEAL DOUBLE PACKING SEALED BEARING NOTE MEASURE GAP HERE 1 APPLY LUB KEY NUMBERS NOT SHOWN ARE 28 30 31 33 36 37 130 AND 13...

Страница 22: ...Design CV500 22 Figure 12 10 and 12 Inch Design CV500 Valve 42B5286 A IL NOTE MEASURE GAP HERE 1 APPLY LUB KEY NUMBERS NOT SHOWN ARE 28 30 31 33 36 37 130 AND 131 DOUBLE PACKING SEALED BEARING...

Страница 23: ...E 1 inch 12B7053X012 1 1 2 2 inch 12B7402X012 3 inch 12B7438X012 4 inch 12B7450X012 6 8 inch 12B7462X012 Graphite 1 inch 13B8816X012 1 1 2 2 inch 13B8816X032 3 inch 13B8816X092 4 inch 13B8816X112 6 8...

Страница 24: ...Deep packing box 2 req d 1 inch 12B7062X012 1 1 2 2 inch 12B7412X012 3 inch 12B7448X012 4 inch 12B7460X012 6 8 inch not available Graphite Packing Standard packing box 1 inch 16A6082X012 1 1 2 2 inch...

Страница 25: ...A5187X012 19A3679X152 4 Sealed 19A3678X012 29A5188X012 6 Standard 1 19A4239X012 19A5190X012 19A4241X132 6 Sealed 19A4240X012 29A5191X012 8 Standard 1 19A3645X012 19A5193X012 19A3647X132 8 Sealed 19A36...

Страница 26: ...Design CV500 26...

Страница 27: ...Design CV500 27...

Страница 28: ...ed herein or their use or applicability We reserve the right to modify or improve the designs or specifications of such products at any time without notice Printed in U S A EFisher Controls Internatio...

Отзывы: