16
INSTALLATION INSTRUCTIONS
Final setup
1
Level the dryer
Stand the dryer upright near the final location
and adjust the four leveling legs at the corners to
ensure that the dryer is level from side to side and
front to rear.
2
Plug dryer in
Note: stacking installations may require a power
cord up to 6 feet (1.8m) in length.
3
Dryer startup
Press the ‘POWER’ button.
Note: if the dryer has been exposed to temperatures
below freezing for an extended period of time, allow
it to warm up before pressing ‘POWER’. Otherwise,
the display will not come on.
The dryer is now ready for use.
49-90571
19
Ensure proper
ground exists
before use.
Levelling the feet