![fisair DFRA Series Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/fisair/dfra-series/dfra-series_user-manual_2294096063.webp)
User Manual DFRA Series |
63
To do this, A and B must be measured, and the number of steps to be cut
obtained from Table 2.
Table 2
9. Once the belt is cut,
steps
14.1.2.1,
14.1.2.2,
14.1.2.3,
14.1.2.4,
14.1.2.5,
14.1.2.6,
14.1.2.7 and 14.1.2.8
must be
repeated until the right dimensions
are
obtained
in
the
spring
tensioner. If not, the process
should be repeated until they are
obtained.
10. Reconnect the earth cable and
power cable (except for DFRA
400, 500 which have not had them
removed beforehand), and replace
the front cover on the base unit.
A(mm)
70
65
60
55
50
45
40
35
B(mm)
0
5
10
15
20
25
30
35
Number of
steps to be
cut
5
4
4
3
2
1
1
0
1 Step
Содержание DFRA Series
Страница 2: ...User Manual DFRA Series 2...
Страница 26: ...User Manual DFRA Series 26 DFRA V standard service area dimensions...
Страница 28: ...User Manual DFRA Series 28 DFRA E standard service area dimensions...
Страница 30: ...User Manual DFRA Series 30 DFRA G standard service area dimensions...
Страница 66: ...User Manual DFRA Series 66 15 Declaration of conformity...
Страница 67: ...User Manual DFRA Series 67 16 Guarantee...
Страница 68: ...User Manual DFRA Series 68...