
Installation
(for qualified installers only)
33
© Travis Industries
8/24/2017 - 1450
42 Apex CF
Steps for Installing the Convection Air Manifold
Attach the Upper Manifold Brackets to
the side framing of the enclosure 11-3/8”
below the header* (min. 14-7/8” under
ceiling).
The brackets must be flush
with the side framing members and
level with each other
(see picture
below).
11-3/8"
Left
Bracket
Right
Bracket
Attach the Upper Manifold to the support
brackets (use 2 SM screws on each
side).
Sheet Metal
Screw