Firenzo DECO RURAL SD Скачать руководство пользователя страница 17

Deco RU SD & Plaza RU SD Installation 

 

 
 

17 

 

5.  ASSEMBLY INSTRUCTIONS 

 

Carefully remove all packaging. 

 
2a 

If installation is into a 

MASONRY ENCLOSURE

: Remove firebricks as necessary to fit 

the firebox into the opening. The firebox front when installed must be flush with the 
finished fireplace surround and on a level base of the same height as the finished floor 
protector.  This may be achieved by using a concrete mix to level the base. 

 
2b 

If installation is into a 

BUILT-IN CANOPY

: Construct the canopy box as per page 7 

and install into framework following guides on pages 8-14 as applicable. 

 

Slide the firebox into the opening so that the outer casing return folds are flush 

 

with the finished fire surround. 

 

DUE TO NEW ZEALAND BEING AN EARTHQUAKE PRONE COUNTRY, IT IS 
IMPORTANT TO ANCHOR THE INSERT DOWN IN CASE OF EARTH 
MOVEMENT.  See diagram page 20 showing Typical Insert Installation. 

 

Install Flue as per instructions on page 18 and 19 if installing in a masonry fireplace or 
page 8,9,10,11,12, 15 if using a Built-in fire canopy (zero clearance box). 

 

Now that the firebox and flue are in position, 

place 25mm white kaowool blanket

 

(supplied) on top of casing

 

As this fire sources its combustion air from the chimney cavity/enclosure, the fire MUST 
be sealed around the front between the casing and the masonry or inbuilt canopy.  This is 
achieved by packing the yellow ISB insulation supplied between the casing and the 
masonry or inbuilt canopy at the FRONT ONLY to maximum depth of 90mm.   

 
 

UNDER NO CIRCUMSTANCES SHOULD THE AIRPORTS ON THE SIDE 
OF THE HEATER BE RESTRICTED.  Refer diagram page 20. 

 
 

The fire sources its combustion air from the chimney cavity, not from the room 
where the fire is installed.  This ventilation air should be drawn down the 
chimney cavity from the air gap set up when the top spacer bracket holds the 
weather collar off from the outer flue casing enabling air to be drawn into the 
chimney cavity.  Failure to ensure this air supply will starve the fire of air and 
lead to poor performance. 

 

Assemble and fit the fascia as per instructions on page 21. 

 

 
NOTE:  In the case of some insert fires into existing masonry fireplaces it may be necessary to 

install additional adventitious ventilation into the chimney cavity as per AS/NZ 2918 
3.4.1.2 to assist air flow into the fire..  This ventilation should not be taken/drawn from 
the room that the fire is installed in. 

 
 
 
 

Содержание DECO RURAL SD

Страница 1: ...AZA RURAL SD The Appliance and Flue System must be installed in accordance with AS NZS2918 Consult with the Building Authority having jurisdiction to obtain a permit prior to commencing the installation Failure to follow these instructions may also void your fire insurance and warranty This unit has been tested to Appendix E B of the joint Australia New Zealand Standard 2918 2001 ...

Страница 2: ...ination 16 4 Pre Installation 17 5 Assembly Instructions 18 6 Insert Flue System for Masonry Installation 19 Minimum Height of Flue System Outlet 20 Typical Insert Installation Diagram 21 7 Fascia Assembly Installation DIAGRAMS Page 4 Fascia Floor Protector Dimensions Page 6 Builtin Fire Canopy Dimensions Page 7 Builtin Fire Canopy Assembly Page 8 12 Builtin Fire Canopy Framing Guide Page 13 14 Ra...

Страница 3: ... USE FLAMMABLE LIQUIDS OR AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHEN IT IS OPERATING Use caution when reloading with fuel Do NOT attempt to load fuel into the heater when the fire inside the stove is at or near its peak Do NOT burn large quantities of paper or combustible material that would create an extremely hot quick fire Do NOT burn highly coloured paper or brochures junk mail USE ONLY D...

Страница 4: ...ht Mantel Shelf In a Masonry Fireplace minimum height above fascia to a combustible mantel shelf 600mm Using a Firenzo Double Shield Deflector this can be reduced to 290mm Installing in an Inbuilt Fire Canopy it can NOT have a combustible mantel The minimum clearance from the fascia to a non combustible mantel is 500mm PLAZA RU SD DECO RU SD ...

Страница 5: ...OR CONSTRUCTION An Insulated Floor Protector shall consist of a minimum thickness of 40mm consisting of 20mm of an approved insulation material material i e 2 sheets of 10mm micorboard or superlux 10mm tile backing board and 10mm tiles or similar on the top surface All joints on the upper surface should be sealed to prevent spilt ash from contacting any heat sensitive material FLOOR PROTECTOR DIME...

Страница 6: ...SD Installation 6 3 BUILT IN FIRE CANOPY A Built In Fire Canopy is required if the fire is not being installed into a masonry fire place For Built In Fire Canopy installations see the following pages 6 7 8 9 10 11 12 13 14 ...

Страница 7: ...Deco RU SD Plaza RU SD Installation 7 ...

Страница 8: ...Deco RU SD Plaza RU SD Installation 8 BUILT IN FIRE CANOPY INSTRUCTONS FOR NON MASONARY INSTALLATION ...

Страница 9: ...Deco RU SD Plaza RU SD Installation 9 ...

Страница 10: ...Deco RU SD Plaza RU SD Installation 10 ...

Страница 11: ...Deco RU SD Plaza RU SD Installation 11 ...

Страница 12: ...Deco RU SD Plaza RU SD Installation 12 ...

Страница 13: ...Deco RU SD Plaza RU SD Installation 13 ...

Страница 14: ...Deco RU SD Plaza RU SD Installation 14 ...

Страница 15: ...Deco RU SD Plaza RU SD Installation 15 Built In Fire Canopy Instructions ...

Страница 16: ...aled with heat resistant material MANTEL Masonry Fireplace If the mantel shelf is of a combustible material there should be a minimum distance above the top of the fascia of 600mm This may be reduced to 290mm provided a Firenzo double skinned heat shield is fitted under the mantel Firenzo heat shields are available from your Firenzo dealer MANTEL using BUILT IN FIRE CANOPY Can NOT have a combustib...

Страница 17: ...position place 25mm white kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire MUST be sealed around the front between the casing and the masonry or inbuilt canopy This is achieved by packing the yellow ISB insulation supplied between the casing and the masonry or inbuilt canopy at the FRONT ONLY to maximum depth of 90mm UND...

Страница 18: ... onto the chimney top The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue pipe is extended over the chimney liner by 180mm Secure top spacer bracket to the flue pipe and ensure slots fit snugly inside the chimney liner 6 Slide flashing cone over top of flue until it rests firmly over top spacer Ensure ventilation gap is...

Страница 19: ...Deco RU SD Plaza RU SD Installation 19 ...

Страница 20: ...Deco RU SD Plaza RU SD Installation 20 ...

Страница 21: ...ack plate against firebox and replace screws 3 Fit lower grill over screws and tighten 4 Place the keyhole brackets on the 3 plate fascia over the protruding screws on the backplate to fit 5 Locate the air control extrusion onto the control rod behind the fascia Plaza requires only the knob to be fitted 6 Fit the ash lip lugs over the two 6mm screws on body and tighten ...

Страница 22: ...ZO WOODFIRES by HEWITSONS LIMITED Manufacturers of Lady Kitchener Contessa Coaster Bronte Viking Royale Zealandia Athena Forte Aqualux 68 Austin Street Onekawa PO Box 3231 Napier 4142 Phone 06 8438260 Fax 06 8430505 Website www firenzo co nz Email hothouse firenzo co nz ...

Отзывы: