3.5   Troubleshooting

Issue

Possible Cause(s)

Suggestion

Power is on at the Cygnus HPG but the 

consumers are not receiving any power

The output MCBs or RCDs may not be 

switched on

Check that the MCBs and RCDs  are pushed 

up to the on position and that the relevant 

output LEDs are illuminated.

The system power has been switched on 

with one of the mode buttons but there is 

no display

The emergency switch may be depressed

Twist the emergency switch clockwise to 

release.

There is power being sent to Cygnus HPG 

but it is not charging or passing through 

power

The input MCBs may not be switched on

Check the input MCBs are pushed up to the 

on position and the input LEDs are on

Output voltage is lower than 220 V AC over 

distance

If the distance between the unit and the 

consumers is more than 50 m the voltage 

can drop too low.

Adjust the voltage settings using the RCC 

03

“Battery Voltage Too Low” Message on 

RCC-03

This indicates that the battery bank voltage 

has reached its lower limit

Charge Cygnus HPG from your chosen 

renewable power source, from an AC grid 

connection or secondary power system

The RCD continually trips

There is an electrical fault with the 

consumers connected to the AC output

Check the electrical integrity of the 

consumers being connected to the unit

The MCB continually trips

The consumers being connected draw too 

much power for the rated output of the 

unit

Refer to the maximum output rating on the 

unit’s rating plate and reduce the total 

power draw accordingly.

Generator auto start not working

Auxiliary signal cable is loose or has been 

damaged

Reattach or replace the auxiliary cable.

A Solar Array is connected to the Solar 

Array inputs but the  Control Centre’s Solar 

Charge indicator does not illuminate

The system has not been switched on

Ensure that the system is switched on and 

that isolators are in the on position.

The Solar Isolator is in the off position

Содержание CYG/12/36

Страница 1: ...24 User manual v1 For use with the following models CYG 12 36 CYG 12 36 S CYG 12 48 CYG 12 48 S CYG 18 36 CYG 18 36 S CYG 18 48 CYG 18 48 S CYG 24 36 CYG 24 36 S CYG 24 48 CYG 24 48 S www fire yclean...

Страница 2: ...3 The Cygnus HPG Control Panel 10 2 4 Connecting Cygnus HPG 12 2 4 1 Earth attachment Installing an Earth Rod 12 2 4 2 Input Options 13 2 4 3 Connect The AC Input 15 2 4 4 Connect The AC Output 17 3 G...

Страница 3: ...xiliary Bus Bar 28 3 4 Care And Maintenance 26 3 4 1 General Cleaning 26 3 4 2 Caring For The Battery Bank 26 3 4 3 Testing Cygnus HPG 26 3 5 Troubleshooting 27 4 Appendices 28 4 1 Connecting To A Fue...

Страница 4: ...anual is to introduce you to Cygnus HPG and provide you with a guide to its safe installation and operation This manual describes how your Cygnus HPG works will help you with fault finding and examine...

Страница 5: ...nt part of Cygnus HPG It must be kept available to all operators and kept close to the unit so that it can be referred to at any time W A R N I N G When the unit is operating it generates potentially...

Страница 6: ...that must be disposed of responsibly For the sake of the environment many of the components within the unit can be recycled or reused Firefly will ensure the safe decommissioning and recycling of the...

Страница 7: ...gy products and services that meet the needs of environmentally concerned individuals and organisations internationally that are looking to reduce their carbon emissions caused by the use of fossil fu...

Страница 8: ...regular fuel powered generators of similar physical dimensions Be sure to double check the capacity of lifting equipment 2 2 1 Transportation 1 Cygnus HPG can be transported using its optional traile...

Страница 9: ...the unit is not at risk from being submersed in water above the fork pockets 2 The unit should be positioned as close as possible to the chosen input source e g Gen Set solar array and where necessar...

Страница 10: ...Page 10 CYGHPG User Manual v2 2 3 The Cygnus HPG Control Panel Fig 1 Control Panel...

Страница 11: ...Connector 230 V AC single phase 63 A CEE Form plug 10 Single Phase AC Input Indicator indicates presence of AC at input connection 11 Three Phase AC Input Indicators indicates presence of AC on each...

Страница 12: ...eaded stud with washers and wing nut located on the skid to the right side of the unit 2 Find a suitable place to drive the earth rod into the ground The earth rod should be driven down at least half...

Страница 13: ...key see Fig 6 5 mm Double Barb Key on page 17 2 Ensure that the unit is switched on 3 Press the down button to wake up the control centre 4 Press the down button repeatedly until the Xtender settings...

Страница 14: ...enter 9 Press SET to store the value 10 The screen will revert to the main display after 20 seconds of inactivity Mode Description Aac Value Mode 1 Three Phase 50 A Mode 2 Single Phase 21 A Mode 3 Th...

Страница 15: ...re switched off 3 Ensure that Cygnus HPG is in Mode 4 Off 4 Ensure that the CEE Form connectors are dry wipe off any excess moisture with an absorbent cloth 5 Insert the 230 V AC supply s CEE Form ind...

Страница 16: ...Input 3 Single Phase Input MCB 4 Three Phase Input MCB 5 Single Phase Output RCD 6 Three Phase Output RCD 7 Single Phase Output MCB 8 Three Phase Output MCB 9 63 A Single Phase Output 10 63 A Three P...

Страница 17: ...e Fig 5 Inputs Outputs and Circuit Breakers on page 16 2 4 4 2 Connecting by Hard Wiring Into The Bus Bar 1 Before any power connections are made ensure that Cygnus HPG is in Mode 4 Off See 3 1 1 Desc...

Страница 18: ...hind the top control panel door Mode 1 Three Phase A three phase input is accepted Three phase power is backed up by the unit s battery bank and available at the output L1 of the three phase output is...

Страница 19: ...ll depend on the power requirements of the installation 1 Ensure that the Emergency stop button is released by rotating it clockwise 2 Switch on the relevant breakers For Mode 1 Three Phase and Mode 3...

Страница 20: ...the display and prepare it for input 3 Press the down arrow once to access the main Battery Monitor screen 4 See Fig 8 The RCC 03 Battery Monitor Screen for a description of the available information...

Страница 21: ...ckwise 3 Once the problem has been rectified follow the instructions in 3 1 Turning The Power On on page 18 to switch the power back on 3 1 5 Turning Off The Cygnus HPG 1 Open the control centre door...

Страница 22: ...a 220 240 V AC supply from either the AC grid supply or a secondary power system To connect an AC supply to Cygnus HPG 1 Connect the AC Input See 4 1 Connecting To A Fuel Generator For Automatic Stop...

Страница 23: ...r Adjustments should only be made by qualified personnel Min 220 V Default 230 V Max 245 V AC In Transfer Maximum current of AC Source Mode 1 Three Phase Min 2 Default 50 Max 50 Maximum current of AC...

Страница 24: ...nverter power level to deactivate pNom Min 20 Default 70 Max 120 Time delay to deactivate minutes Min 0 Default 60 Max 60 Contact active according to SoC Contact activated with SoC 1 No Yes Default Co...

Страница 25: ...Yes RCC Settings Language English French German Spanish Time Date User Level Unlock code required available from the manufacturer on request Save Restore Files Save all files system backup Set Confir...

Страница 26: ...Supply on page 22 for further information 3 4 3 Testing Cygnus HPG It is recommend that the unit should be tested annually for electrical safety by a qualified electrician Local regulations may requi...

Страница 27: ...the voltage settings using the RCC 03 Battery Voltage Too Low Message on RCC 03 This indicates that the battery bank voltage has reached its lower limit Charge Cygnus HPG from your chosen renewable po...

Страница 28: ...vailable from the manufacturer as an accessory Only the yellow green red connections are used as follows Wire Colour Connection Red Normally Closed Yellow Common Green Normally Open Blue Not Used 4 1...

Страница 29: ...n receiving input from a solar array Cygnus HPG should be connected to earth This can be facilitated either by use of an earth rod see 4 2 Earthing Cygnus HPG on page 29 or connecting to a suitable ex...

Страница 30: ...rator Start Bulgin Buccaneer Mini400 4 pin 9 bus bar mounted screw terminal contacts 2 programmable Aux relays Battery Monitoring LCD Battery Monitor Voltage Power In Out Capacity Available Time Avail...

Отзывы: