COMMISSIONING
OIL SYSTEM
A two single pipe system may also be used in low-level
tank installations (see previous page). Please flush out the
diesel pipe by drawing off some diesel before connecting
the fuel pipe to the burner - otherwise there is a danger of
grit and dirt being forced into the burner pump, resulting
in pump blockage, damage and “lock-out”.
CHECKLIST FOR INSTALLING AND
COMMISSIONING A FIREBIRD BOILER
Pre-installation check:
Is the following documentation included with the
boiler, Installation Manual, Burner Book?
Is the base on which the boiler is to be installed solid?
Allow sufficient room for future servicing of the boiler.
Where does the flue terminate:
Make sure there is no window, door or fence within 1
metre of the flue-terminal.
If the flue terminates in a corner or into an allyway,
re- circulation of the combustion gases in the air intake
could occur. A plume dispersal may be required or an
alternative flue arrangement might be available.
Contact the Central Heating New Zealand technical
department.
The appropriate class 1 flue must be used with a
conventional flue installation. Contact Central Heating
New Zealand if unsure.
Power supply:
Is a timed and permanent power supply available, via a
fused spur with a 5amp fuse.
Oil supply:
The burner is set for Diesel 35 Second Gas Oil
Check that there is a good quality filter on the line with
an isolating valve.
There should be a remote sensing fire valve.
If a deaerator is required, fit the bypass screw in the
diesel pump. Check that the second flexible diesel line
is approved by the manufacturer.
Verify that the diesel tank has been installed correctly
as per building standards.
COMMISSIONING
It is the responsibility of the installer/end user to
ensure that the boiler is properly commissioned
when first used.
The boiler should be commissioned by a
competent,
qualified engineer,
preferably
familiar with Firebird products.
The commissioning card should be completed and
posted to Central Heating New Zealand within 28
days of installation and a copy should be retained
by the commissioning engineer.
The system should be checked thoroughly.
PROCEDURES
DIESEL TANK
The installation of the Diesel tank and supply line should
comply with all the instructions shown earlier in this
manual. Consult OFTEC Book 3.
If a single supply line is used, ensure that the bottom of the
tank is above the burner. A suction line system via a
deaerator should be used where the level of the diesel in
the tank may fall below the level of the oil burner pump.
Check and ensure correct grade fuel oil
has been supplied.