START-UP AND OPERATION INSTRUCTIONS
BIG 38/48
The slings used must be of a suitable capacity for the load. All handling operations
should be performed very slowly to prevent the load from swinging or tipping. Any
improper handling manoeuvres could damage the machine or expose operators to risk.
For the machine dimensions and weight, see point 2.3 Handling of the machine should
only be carried out by authorised personnel trained in the use of lifting equipment.
LOADING DIAGRAM
4.2. STORAGE
If the machine is not installed immediately, it should be stored in an enclosed, dry location to ensure the proper
preservation and efficiency of all its components. Relative humidity must be below 80% and the storage
temperature must be between 3°C
and
+ 45 °C.
4.3.
UNPACKING THE MACHINE
Cut the strapping with care so that it does not spring up;
Remove the staples on the base connecting the box to the pallet
If the package is made of plywood, remove the staples from the sides and base of each panel;
Cut the strapping holding the machine in place;
Place the machine on the ground.
4.4. HANDLING THE UNPACKED MACHINE
When handling the machine for short transport after use, disconnect the battery cables and remove the
brushes and squeegee; for longer transport, repack the machine in the original box.
FIGURE 4.2