71-0165
Page 12
4215-137
Rev. 01
09/07/2021
33.
Cut metal drip edge to the length of the roof and install to the
back side of roof so the side with three grooves is on top of roof .
Secure to roof with roofing nails or staples (not supplied).
34.
Install the roofing felt on the roof panel using a stapler to
prevent moisture from getting on the wood. Start from the
back of the room, working towards the front. Overlap the
paper a minimum of 2” to ensure moisture does not get
under the paper. Trim tar paper to be flush with the edges of
the roof panels.
35.
Lay out the
metal roofing sheets on a flat surface to determine
the amount of overlap needed to match the width of the roof.
Note: The flat edge of the metal sheet should always be on top.
36.
Install roofing, starting from the
left side of the room. The edge of the
first sheet should be flush with the left
edge of the roof panel and the drip
edge. Secure sheets with roofing
screws at the top edge (front of room).
37.
Insert foam between metal roofing and drip edge to prevent insects from getting under roofing.
Flat Edge