![Fiessler BLCT Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/fiessler/blct/blct_operating-manual_2288060033.webp)
Alignment between the transmitter and receiver must always start with the
last
light grid,
any light grid being enabled only after the one succeeding it has been enabled.
If the protective field of a downstream sensor in a cascaded light grid is interrupted, the
corresponding yellow LED flashes at one-second intervals. If the downstream sensor's
protective field is intact, the yellow LED remains solidly lit and the transmitter is ready for
operation.
Alignment sequence:
Step 1:
Align downstream sensor 2 first
L
ED
s
an
d
d
is
p
la
ys
o
n
th
e
re
ce
iv
er
OSSDs on (active)
OSSDs off (inactive)
Display of the 1
st
interrupted light beam
No light reserves
Start enable
7
Cascaded light grids ...LCT-K
33
Table of Contents
FIESSLER
E L E K T R O N I K
Commissioning and optical alignment of cascaded light grids
Ma
ch
in
e
co
nt
ro
l a
nd
vo
lta
ge
su
pp
ly
Transmitter
Transmitter
Receiver
Receiver
Transmitter
Transmitter
Yellow LED shines
Yellow LED shines
Yellow LED flashes
about once a second
Step 2:
Align downstream sensor 2
Step 3:
Align the main sensor last
Green or yellow LED (depending on the operating mode) on the main sensor receiver shines when
alignment is correct
Ma
ch
in
e
co
nt
ro
l a
nd
vo
lta
ge
su
pp
ly
Receiver
Transmitter
Receiver
Transmitter
Yellow LED shines
Yellow LED shines
Yellow LED shines
Transmitter
Receiver
Ma
ch
in
e
co
nt
ro
l a
nd
vo
lta
ge
su
pp
ly
Receiver
Transmitter
Transmitter
Receiver
Receiver
Transmitter
Yellow LED shines
Yellow LED shines
Yellow LED shines
Display indicates 00 or the 1
st
interrupted light beam
Fiessler Elektronik GmbH & Co. KG
Telefon: +49 (0) 711 / 91 96 97-0 Internet: http://www.fiessler.de
Telefax: +49 (0) 711 / 91 96 97-50 eMail: [email protected]
Doku Nr. 1121 Stand 08.01. 2018 RK/Aui