Fieldpiece Job Link SC480 Скачать руководство пользователя страница 13

25

24

Phase Rotation Test (L1L2, L1L3)

Connect 3-phase power lines in the correct order to the terminals of 

a motor to ensure the motor turns in the intended direction. Incorrect 

wiring can damage some equipment. The terminals on the motor are 

usually marked L1, L2, and L3; however, the wires supplying power 

usually are not. Perform a simple phase rotation test with two test leads 

to quickly identify the order of 3-phase power lines.

Range:

  80±5 VAC to 600VAC (50Hz to 80Hz)  

Resolution:  

0.1V

Accuracy:  

±(1.5% rdg + 10 dgts)

Overload Protection:

  600VDC or AC rms

How to Perform a Phase Rotation Test

Set 1:  Select Function

Switch to 

. Plug black test lead 

into the COM (L1) port and red test lead 

to the VΩ (L2 L3) port on the SC480. 

You will see “L1L2” blinking 

to indicate phase rotation test 

is ready to begin.

Step 2:  Connect Leads

Connect both black and red 

test leads to any two of the three 

phase voltage lines in question. 

The line voltage will hold on the 

bottom display. Blinking L1 and 

L2 disappear. L3 will blink on top 

display to indicate test is ready for 

Step 2.

Important:  Step 2 must 

be performed within 

5 seconds of complet-

ing Step 1 or “Err” will 

show and Step 1 must 

be repeated.

Step 3:  Move Red Lead

With the black lead still on 

“L1”, move the red test lead to the 

third 3-phase voltage line. The line 

voltage will hold on the bottom 

display. The top display will show 

L123 indicating forward or L321 

indicating reversed.

Simply swap any two lines to 

change the direction. You can verify 

this by performing the test again.

Содержание Job Link SC480

Страница 1: ...1 Fieldpiece Job Link System Power Clamp Meter OPERATOR S MANUAL Model SC480 ...

Страница 2: ... generated from frequencies above 1000Hz as the low pass filter limits voltage measurements to below 1000Hz Do not use during electrical storms or in wet weather Do not use around explosive gas dust or vapor Do not apply more than the rated voltage to as marked on the meter between terminals or between any terminal and earth ground Donotusewithoutthebatteryandthebackcase properly installed Replace...

Страница 3: ...ensure proper operation Usetheproperterminals functionsandrangefor your measurements Never ground yourself when taking electrical measurements Connect the black common lead to ground or neutral before applying the red test lead to potential voltage Disconnect the red test lead from the voltage first Always work with a partner Keep fingers behind the finger guards on the probes All voltage tests Al...

Страница 4: ...se voltage lines with just two leads Capture L1L2 and L1L3 to check that motor lines are correctly installed with Phase Rotation test Take more accurate VAC and AAC readings on variable frequency drives with True RMS sensing technology Measure the starting amp draw of a compressor with Inrush current mode IlluminatethewaywithapowerfulLEDbuiltinto the clamp jaw Easily see your measurements with the...

Страница 5: ...for HVACR professionals Select the parameter on the dial you want to measure with the rotating selector switch TRUE RMS AUTO OFF TYPE K 30V MAX T1 L1 L2 L3 T2 Sync Range Select H M m SC660 ZERO ADC F C TEMP CAT III 600V COM TRUE RMS AUTO OFF TYPE K 30V MAX T1 T2 S y n c OFF Range Select H M m SC660 Z E R O A D C F C INRUSH TRUE RMS AUTO OFF TYPE K 30V MAX T1 L1 L2 L3 T2 Sync OFF Range Select H M m...

Страница 6: ... Celsius ContinuityTest DiodeTest Frequency Hertz ResistanceTest Ohms CapacitanceTest farads Microamps DC Nano Unit 10 9 one billionth Micro Unit 10 6 one millionth Milli Unit 10 3 one thousandth Kilo Unit 103 one thousand Mega Unit 106 one million Alternating Current Direct Current Easy to Read Display Easily see your measurements on the big dual display You ll never miss a reading no matter the ...

Страница 7: ...otection 1000VDC or 750VAC rms Volts DC VDC SelectVDC and measure DC voltages on circuit boards on more advanced HVACR systems and logic control boards Ranges 1000mV 10V 100V 1000V Resolution 0 1mV Accuracy 0 5 5 Input Impedance 5MΩ Overload Protection 1000VDC or 750VAC rms Non ContactVoltage NCV Use NCV to check 24VAC from a thermostat or live voltage up to 600VAC Always test a known live source ...

Страница 8: ...C Frequency Hz through the clamp and Inrush AAC current is measured in theVAC AAC Hz switch position shown above Inrush AAC Current Inrush mode captures the starting amp draw of a motor Starting amp draw can assist in diagnosing a motor before it fails Activate Inrush mode 1 Rotate selector switch toVAC AAC Hz 2 PressSELECToncetoshowAAConupperdisplay PressINRUSHonthe rightsideofmetertoactivateInru...

Страница 9: ...uracy 1 0 5 Volts burden 5V Overload Protection 600VDC or 600VAC rms Capacitance MFD Testmotorstartandruncapacitors Capacitorsareoneofthemost failurepronecomponentsinaHVACRsystem Disconnectfrompowerand anyresistorsfoundbetweenterminals Discharge capacitor before testing If dIS C is displayed the capacitor needs to be fully discharged to test Press SELECT three times to enter Capacitance mode Range...

Страница 10: ...0V TEMP K TYPE 30V MAX SEL Perfect for checking isolated fuses use the continuity function to test whether a circuit is open no beep no green LED or closed beep and green LED Press SELECT once to enter Continuity mode Range 100Ω Resolution 0 01Ω Response time 100ms Audible beep 30Ω Visual Indicator Green LED Overload Protection 600VDC or 600VAC rms DiodeTest O O F F F F MFD NCV V AC VDC AAC Hz Hz ...

Страница 11: ...he particularT C that is plugged into it Though it s possible for a calibration to hold for years it s best practice to calibrate regularly if only to verify accuracy Labelling yourT C T1 orT2 will help ensure using the sameT C forT1 andT2 ports Calibration is quick and easy requiring just a known temperature to calibrate to Ice water is probably the most accurate and readily available known tempe...

Страница 12: ...h voltage and amperage simultaneously Connect test leads to main power supply terminals and secure amp clamp around the same line that the positive red test lead is connected to See Power Factor in top display and Power in bottom display Press SELECT to toggle Active Power W Reactive Power VAr Apparent Power VA CAUTION DO NOT MEASUREVOLTAGE LINES OR EXPOSETHE METERTO LIVE POWER LINES EXCEEDING 750...

Страница 13: ... port and red test lead to theVΩ L2 L3 port on the SC480 You will see L1L2 blinking to indicate phase rotation test is ready to begin Step 2 Connect Leads Connect both black and red test leads to any two of the three phase voltage lines in question The line voltage will hold on the bottom display Blinking L1 and L2 disappear L3 will blink on top display to indicate test is ready for Step 2 Importa...

Страница 14: ...e sure voltage lines arewithin50 80Hztoperformthephaserotation test Modular Expandability Your SC480 is compatible with all Fieldpiece Accessory Heads WithFieldpiece Accessory Heads youcanmeasureanyavailableparameter andread the measurement on your new meter s display in real time Hold Max and min Rotate the selector toVDC and stay in mV range Remove the probe tips of your test leads and connectyo...

Страница 15: ...iece com for all Job Link System options Wireless Mode Send electrical measurements wirelessly from SC480 directly to the Job Link mobile app No JL2 transmitter required Sending Wireless Measurements 1 Select any switch position other than L1L2 and NCV on SC480 2 Press WIRELESS ON OFF button on meter 3 Favorite your SC480 by going to the measurement screen in the Job Link app 4 Tap on Electrical t...

Страница 16: ...SC480 measurement in Job Link mobile app SeeWireless Section for Job Link compatibility details HighVoltageWarning The symbol will display when measuring 30VAC VDC An audible beep will be heard and red LED will be shown Battery Replacement Whenyourmeter sbatteryislow thebatteryicon will appear empty and blink for 30 seconds bAtt will display and meter will power off Turn dial to OFF position disco...

Страница 17: ...vironment 32 F to 122 F 0 C to 50 C at 70 RH Storage temperature 4 F to 140 F 20 C to 60 C 0 to 80 RH with battery removed Accuracy Stated accuracy 73 F 9 F 23 C 5 C 75 RH Temperature coefficient 0 1 x specified accuracy per C 0 C to 19 C 32 F to 66 F 28 C to 50 C 82 F to 122 F APO Auto Power Off Approx 30 minutes Power Single standard 9 volt battery NEDA 1604 JIS 006P IEC 6F22 Battery life 100 ho...

Страница 18: ...is device and its antenna s must not be co located or operating in conjunction with any other antenna or transmitter IMPORTANT NOTE FCC Radiation Exposure Statement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment This equipment should be installed and operated with minimum distance 20cm between the radiator your body IC Statement This device con...

Страница 19: ...tive unit at its option subject to verification of the defect This warranty does not apply to defects resulting from abuse neglect accident unauthorized repair alteration or unreasonable use of the machine Any implied warranties arising from the sale of a Fieldpiece product including but not limited to implied warranties of merchantability and fitness for a particular purpose are limited to the ab...

Страница 20: ...38 SC480 Fieldpiece Instruments Inc 2020 v12 ...

Отзывы: