
8
Line Rail Installation (continued)
6
Preparing the top rail
□
Place top rail brackets (AA) over each end of the top rail.
AA
7
Inserting balusters
□
Insert a baluster into the first and last baluster holes in the
bottom rail.
NOTE:
Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
8
Positioning the top rail
□
Carefully position the top rail between the posts and lower
onto the two balusters. Ensure you fully seat the balusters
into the top rail.
□
Check the top rail and ensure it is level.
9
Marking and drilling top rail holes
□
Lightly trace a line to show the location of the top rail
bracket (AA).
□
Remove the top rail and mark the location of the bracket
flange. Then pre-drill holes with a 5/32 in. drill bit and
attach the top bracket flange (CC) using the #10 x 1.5 in.
screws (FF).
AA
CC
FF