background image

 

 

FGE Elettronica S.p.a 
Via C.A. Dalla Chiesa, 10 
25017 – Lonato del Garda (BS) 
P.I. IT01975940162 

Tel: 030 9919700 

Fax: 030 9913955 

[email protected]

 
 

www.fgespa.com 

 

EN

 

SLM1: Quick Reference – Rev06

 

Page 6/9

 

 

Power supply 
connection 

 

Make sure that the supply voltage is correct. 
Turn off the voltage from the power patch cord. 
Connect the power supply wires to the clamp POWER of the control unit. 
 

Checks   

Verify that all connections have been done and that the cables are placed correctly 
into the dedicated housings.  

 

2.4

 

Learning process and field-testing 

Once  completed  the  installation  process  described  in  the  previous  paragraph,  proceed  with  the  starting 

and the configuration of the system: 

Step  

Operation 

Description 

Power supply test 

Connect the main power supply 

Briefly press the button 

 on the panel of the control unit to turn the 

system on. 

The control unit controls the parts connected. LEDs 

 blink showing  

the headers that are connected (T1, T2, T3). 
All the installed doors make a short synchronization movement, then every 
panel closes completely. 
Verify that all panels are closed correctly. 
The control unit signals that the status of the system is ready (led Rdy on). 
If the learning process has never been made, all the LEDs are on. 

Execution of the 
learning process 

Press button 

 on the control unit panel for at least 5s (led SETUP on). 

All the automation systems execute the cycle of learning of the door, 
starting from the first panel (individually for each panel). 
Verify the correct place of the panel once ended the opening and closing 
processes. 
At the end of the learning process the panels are all closed. 
The speed profiles are pre-set. To change the applied speed profiles, refer to 
the User manual.

 

Movements check 
through the Inspection 
mode of the control 
unit 

Press button 

 on the control unit panel for at least 5s. 

The Inspection mode of the control unit is now active. 

Press-and-hold the button 

 to open the panels 

Press-and-hold the button 

 to close the panels 

Simultaneously press the buttons 

 and 

 to select the next panel. 

Simultaneously press the buttons 

 and 

 to select the previous 

panel. 
 
The table below shows the led signals that indicate which door is moving 
(LEDs that are not mentioned are OFF):  

Содержание SLM1

Страница 1: ...EN PRJ1080_03_07_03_QR REV 06 SLM1 LINEAR MOTION SYSTEM FOR REFRIGERATOR DOORS QUICK REFERENCE NOTE The complete user manual can be downloaded from our website www fgespa com ...

Страница 2: ...or reception of commands from the control unit D2 Motor driver 2 Driver and motor reception of commands from the control unit Cnt Control unit Control unit management of the entire system parameters and movements of the system C Signals concentrator Auxiliary inputs that are monitored and connected to the signals concentrator The status of these inputs is transferred to the control unit T2 Expansi...

Страница 3: ...f headers depending on the application 2 doors 4 doors 6 doors Internal connections are pre wired 1 2 3 Control unit 1 Option 1 Sensor pre wired inside the header 2 sensors for each header Option 2 Concentrator 1 Pedals 2 doors 4 doors 6 doors Patch cord 1m concentrator vs control unit 1 One pedal for each door 2 4 6 1 Set 1 Plate 4 screws VTSTC M4x20 4 washers DE4 1 set for each header Set 4 scre...

Страница 4: ...utomation system Verify that the movement of the panels is free and without obstacles along the entire travel 2 3 Installation of mechanical and electronic parts 1 Mechanical installation of the header a Fasten the header to the support frame as shown in Figure 2 1 2 Fasten the panel to the header as shown in Figure 2 1 3 Mechanical installation of the control unit and concentrator if present in a...

Страница 5: ...6 DOORS If present check the dip switch configuration of the concentrator ON for a single header OFF for multiple headers 2 Pedals connection option 2 Connect the pedals provided with cable to the connection clamps of the concentrator connector X3 according to the doors sequence Pedal for door1 connected to clamp X3 1 X3 2 Pedal for door2 connected to clamp X3 3 X3 4 Pedal for door3 connected to c...

Страница 6: ...ovement then every panel closes completely Verify that all panels are closed correctly The control unit signals that the status of the system is ready led Rdy on If the learning process has never been made all the LEDs are on 2 Execution of the learning process Press button on the control unit panel for at least 5s led SETUP on All the automation systems execute the cycle of learning of the door s...

Страница 7: ... ON when at least one door is completely open 5 Check of obstacle during opening process Acting in sequence on all the connected activation sources and stop the opening movement of the panels When the related driver recognizes the obstacle there is an inversion of 20mm 2s pause to let the obstacle to be removed Remove the obstacle Wait for the conclusion of the opening and closing processes before...

Страница 8: ...NSP ON Led blinking SETUP 500ms ON 500ms OFF LEDs 40 60 80 100 display the current selected panel as showed below Door1 selected Door2 selected Door3 selected Door4 selected Door5 selected Door6 selected CHANGE OF PROFILES Access and exit starting from the inspection mode Press button once Button Decrease Button Increase Led SETUP ON Led profile 40 60 80 100 ON CHANGE OF INVERSION FORCES Access an...

Страница 9: ... p a Via C A Dalla Chiesa 10 25017 Lonato del Garda BS P I IT01975940162 Tel 030 9919700 Fax 030 9913955 info fgespa com www fgespa com EN SLM1 Quick Reference Rev06 Page 9 9 4 Attachments Declaration of Conformity DoC ...

Страница 10: ...IT PRJ1080_03_07_03_QR REV 06 SLM1 SISTEMA LINEARE DI MOVIMENTAZIONE PORTE PER FRIGORIFERI QUICK REFERENCE NOTA il manuale completo può essere scaricato del nostro sito internet www fgespa com ...

Страница 11: ... motore riceve i comandi dalla centralina D2 Driver motore 2 Driver e motore riceve i comandi dalla centralina Cnt Centralina di controllo Centralina di controllo gestisce tutto il sistema i parametri e i movimenti del sistema C Concentratore ingressi Ad esso sono connessi tutti i segnali ausiliari che sono monitorati Lo stato di questi ingressi è inviato alla centralina T2 Traversa di espansione ...

Страница 12: ...ornito Traversa e in base all applicazione 2 ante 4 ante 6 ante Tutte le connessioni interne sono pre cablate 1 2 3 Centralina 1 Opzione1 Sensore pre cablato in traversa 2 sensori per ogni traversa Opzione 2 Concentratore 1 Pedali 2 ante 4 ante 6 ante Patch cord 1m concentratore vs centralina 1 Un pedale per ogni anta 2 4 6 1 Set 1 Piastra 4viti VTSTC M4x20 4 rondelle DE4 1 set per ogni traversa S...

Страница 13: ...ia stato predisposto il cavo di alimentazione Verificare che il movimento dei pannelli sia libero senza ostacoli lungo tutta la corsa 2 3 Installazione delle parti meccaniche ed elettriche 1 Montaggio meccanico della traversa a Il fissaggio della traversa al supporto è da eseguire come indicato in Figura 2 1 2 Fissaggio del pannello alla traversa sempre come indicato in Figura 2 1 3 Montaggio mecc...

Страница 14: ...erificare la configurazione per i dip switch del concentratore tutti a ON per traversa singola tutti a OFF per traverse multiple 2 Connessione pedali opzione 2 Collegare i pedali provvisti di cavo ai morsetti di connessione del concentratore connettore X3 in base alla sequenza delle ante Pedale per anta1 collegato al morsetto X3 1 X3 2 Pedale per anta2 collegato al morsetto X3 3 X3 4 Pedale per an...

Страница 15: ... e poi si ha una completa chiusura di tutti pannelli Verificare che tutti i pannelli siano correttamente chiusi La centralina segnala lo stato di sistema pronto led Rdy acceso Se non è mai stata eseguita l operazione di apprendimento tutti i led sono accesi 2 Esecuzione dell apprendimento Premere per almeno 5s il tasto sul pannello della centralina led SETUP acceso Tutte le automazioni eseguono il...

Страница 16: ...mpre acceso Closed Acceso quando TUTTE le ante sono chiuse Opened Acceso quando almeno un anta è completamente aperta 5 Verifica delle inversioni in apertura Agire in sequenza su tutte le sorgenti di attivazione collegate e interrompere il movimento di apertura dei pannelli Quando il driver relativo riconosce l ostacolo si ha una inversione di 20mm pausa di 2s per consentire la rimozione dello ste...

Страница 17: ... precedente Led INSP ON Lampeggio Led SETUP 500ms ON 500ms OFF I led 40 60 80 100 visualizzano l attuale pannello selezionato come riportato sotto Anta1 selezionata Anta2 selezionata Anta3 selezionata Anta4 selezionata Anta5 selezionata Anta6 selezionata CAMBIO PROFILI Accesso e uscita a partire dalla modalità ispezione Pressione singola tasto Tasto Decremento Tasto Incremento Led SETUP ON Led pro...

Страница 18: ... p a Via C A Dalla Chiesa 10 25017 Lonato del Garda BS P I IT01975940162 Tel 030 9919700 Fax 030 9913955 info fgespa com www fgespa com IT SLM1 Quick Reference Rev06 Pagina 9 9 4 Allegati Dichiarazione di conformità DDC ...

Страница 19: ...NOTE ...

Страница 20: ...NOTE ...

Отзывы: