background image

 

 

FGE Elettronica S.p.a 
Via C.A. Dalla Chiesa, 10 
25017 – Lonato del Garda (BS) 
P.I. IT01975940162 

Tel: 030 9919700 

Fax: 030 9913955 

[email protected]

 
 

www.fgespa.com 

 

EN

 

SLM1: Quick Reference – Rev06

 

Page 7/9

 

 

 

Door1 selected 

 

Door2 selected 

 

Door3 selected 

 

Door4 selected 

 

 

Door5 selected 

 

 

Door6 selected 

 

Check of activation 
sources 
(Option1 sensors or 
Option2 pedals) 

Press the button

 

on the control unit panel for 5s to exit the Inspection 

mode set in the previous step. 
 
Acting in sequence on all the connected activation sources and verify that 
the panels open correctly. After every activation, wait for the conclusion of 
the opening and closing processes. 
 
Views: 

 (Ready) 

Always ON  

 (Closed) 

ON when ALL the doors are closed 

 (Opened) 

ON when at least one door is completely 
open 

 

Check of obstacle 
during opening process 

Acting in sequence on all the connected activation sources and stop the 
opening movement of the panels. 
 
When the related driver recognizes the obstacle, there is an inversion of 
20mm + 2s pause, to let the obstacle to be removed. Remove the obstacle. 
Wait for the conclusion of the opening and closing processes before acting 
on the following panel. 
 
Views: 

 (Obstacle) 

ON during inversion  

 

Check of obstacle 
during closing process 

Acting in sequence on all the connected activation sources and stop the 
opening movement of the panels. 
 
When the related driver recognizes the obstacle, there is a complete 
inversion to let the obstacle to be removed. After a pre-defined time the 
panel closes. Wait for the conclusion of the re-opening and closing processes 
before acting on the following panel. 
 

 (Obstacle) 

ON during re-opening process 

 

Содержание SLM1

Страница 1: ...EN PRJ1080_03_07_03_QR REV 06 SLM1 LINEAR MOTION SYSTEM FOR REFRIGERATOR DOORS QUICK REFERENCE NOTE The complete user manual can be downloaded from our website www fgespa com ...

Страница 2: ...or reception of commands from the control unit D2 Motor driver 2 Driver and motor reception of commands from the control unit Cnt Control unit Control unit management of the entire system parameters and movements of the system C Signals concentrator Auxiliary inputs that are monitored and connected to the signals concentrator The status of these inputs is transferred to the control unit T2 Expansi...

Страница 3: ...f headers depending on the application 2 doors 4 doors 6 doors Internal connections are pre wired 1 2 3 Control unit 1 Option 1 Sensor pre wired inside the header 2 sensors for each header Option 2 Concentrator 1 Pedals 2 doors 4 doors 6 doors Patch cord 1m concentrator vs control unit 1 One pedal for each door 2 4 6 1 Set 1 Plate 4 screws VTSTC M4x20 4 washers DE4 1 set for each header Set 4 scre...

Страница 4: ...utomation system Verify that the movement of the panels is free and without obstacles along the entire travel 2 3 Installation of mechanical and electronic parts 1 Mechanical installation of the header a Fasten the header to the support frame as shown in Figure 2 1 2 Fasten the panel to the header as shown in Figure 2 1 3 Mechanical installation of the control unit and concentrator if present in a...

Страница 5: ...6 DOORS If present check the dip switch configuration of the concentrator ON for a single header OFF for multiple headers 2 Pedals connection option 2 Connect the pedals provided with cable to the connection clamps of the concentrator connector X3 according to the doors sequence Pedal for door1 connected to clamp X3 1 X3 2 Pedal for door2 connected to clamp X3 3 X3 4 Pedal for door3 connected to c...

Страница 6: ...ovement then every panel closes completely Verify that all panels are closed correctly The control unit signals that the status of the system is ready led Rdy on If the learning process has never been made all the LEDs are on 2 Execution of the learning process Press button on the control unit panel for at least 5s led SETUP on All the automation systems execute the cycle of learning of the door s...

Страница 7: ... ON when at least one door is completely open 5 Check of obstacle during opening process Acting in sequence on all the connected activation sources and stop the opening movement of the panels When the related driver recognizes the obstacle there is an inversion of 20mm 2s pause to let the obstacle to be removed Remove the obstacle Wait for the conclusion of the opening and closing processes before...

Страница 8: ...NSP ON Led blinking SETUP 500ms ON 500ms OFF LEDs 40 60 80 100 display the current selected panel as showed below Door1 selected Door2 selected Door3 selected Door4 selected Door5 selected Door6 selected CHANGE OF PROFILES Access and exit starting from the inspection mode Press button once Button Decrease Button Increase Led SETUP ON Led profile 40 60 80 100 ON CHANGE OF INVERSION FORCES Access an...

Страница 9: ... p a Via C A Dalla Chiesa 10 25017 Lonato del Garda BS P I IT01975940162 Tel 030 9919700 Fax 030 9913955 info fgespa com www fgespa com EN SLM1 Quick Reference Rev06 Page 9 9 4 Attachments Declaration of Conformity DoC ...

Страница 10: ...IT PRJ1080_03_07_03_QR REV 06 SLM1 SISTEMA LINEARE DI MOVIMENTAZIONE PORTE PER FRIGORIFERI QUICK REFERENCE NOTA il manuale completo può essere scaricato del nostro sito internet www fgespa com ...

Страница 11: ... motore riceve i comandi dalla centralina D2 Driver motore 2 Driver e motore riceve i comandi dalla centralina Cnt Centralina di controllo Centralina di controllo gestisce tutto il sistema i parametri e i movimenti del sistema C Concentratore ingressi Ad esso sono connessi tutti i segnali ausiliari che sono monitorati Lo stato di questi ingressi è inviato alla centralina T2 Traversa di espansione ...

Страница 12: ...ornito Traversa e in base all applicazione 2 ante 4 ante 6 ante Tutte le connessioni interne sono pre cablate 1 2 3 Centralina 1 Opzione1 Sensore pre cablato in traversa 2 sensori per ogni traversa Opzione 2 Concentratore 1 Pedali 2 ante 4 ante 6 ante Patch cord 1m concentratore vs centralina 1 Un pedale per ogni anta 2 4 6 1 Set 1 Piastra 4viti VTSTC M4x20 4 rondelle DE4 1 set per ogni traversa S...

Страница 13: ...ia stato predisposto il cavo di alimentazione Verificare che il movimento dei pannelli sia libero senza ostacoli lungo tutta la corsa 2 3 Installazione delle parti meccaniche ed elettriche 1 Montaggio meccanico della traversa a Il fissaggio della traversa al supporto è da eseguire come indicato in Figura 2 1 2 Fissaggio del pannello alla traversa sempre come indicato in Figura 2 1 3 Montaggio mecc...

Страница 14: ...erificare la configurazione per i dip switch del concentratore tutti a ON per traversa singola tutti a OFF per traverse multiple 2 Connessione pedali opzione 2 Collegare i pedali provvisti di cavo ai morsetti di connessione del concentratore connettore X3 in base alla sequenza delle ante Pedale per anta1 collegato al morsetto X3 1 X3 2 Pedale per anta2 collegato al morsetto X3 3 X3 4 Pedale per an...

Страница 15: ... e poi si ha una completa chiusura di tutti pannelli Verificare che tutti i pannelli siano correttamente chiusi La centralina segnala lo stato di sistema pronto led Rdy acceso Se non è mai stata eseguita l operazione di apprendimento tutti i led sono accesi 2 Esecuzione dell apprendimento Premere per almeno 5s il tasto sul pannello della centralina led SETUP acceso Tutte le automazioni eseguono il...

Страница 16: ...mpre acceso Closed Acceso quando TUTTE le ante sono chiuse Opened Acceso quando almeno un anta è completamente aperta 5 Verifica delle inversioni in apertura Agire in sequenza su tutte le sorgenti di attivazione collegate e interrompere il movimento di apertura dei pannelli Quando il driver relativo riconosce l ostacolo si ha una inversione di 20mm pausa di 2s per consentire la rimozione dello ste...

Страница 17: ... precedente Led INSP ON Lampeggio Led SETUP 500ms ON 500ms OFF I led 40 60 80 100 visualizzano l attuale pannello selezionato come riportato sotto Anta1 selezionata Anta2 selezionata Anta3 selezionata Anta4 selezionata Anta5 selezionata Anta6 selezionata CAMBIO PROFILI Accesso e uscita a partire dalla modalità ispezione Pressione singola tasto Tasto Decremento Tasto Incremento Led SETUP ON Led pro...

Страница 18: ... p a Via C A Dalla Chiesa 10 25017 Lonato del Garda BS P I IT01975940162 Tel 030 9919700 Fax 030 9913955 info fgespa com www fgespa com IT SLM1 Quick Reference Rev06 Pagina 9 9 4 Allegati Dichiarazione di conformità DDC ...

Страница 19: ...NOTE ...

Страница 20: ...NOTE ...

Отзывы: