background image

 

2/19/09

MR15554

12

BOX SCRAPER SETUP

 

 

READ AND UNDERSTAND ALL SAFETY STATEMENTS

 

 

Read all safety decals and safety statements in all manuals before beginning any Snow   

 

 

Blower setup.  Know and obey all OSHA regulations, local laws, and other professional    

 

 

guidelines for your operation.  Know and follow good work practices when assembling,    

 

 

maintaining, repairing, mounting, removing, or operating this equipment.

EXCAVATING, GRADING, AND BACKFILLING

Park your prime mover on a level surface with this product properly attached.
Place your prime mover's transmission in "Park" and engage the parking brake.
Lower this product onto the level surface.
Make sure that the hydraulic cylinder is fully extended so that the ripper shanks are in the fully raised 
position.
Shut off your prime mover's engine, remove the starter key, wait for all moving parts to come to a 
stop, and relieve all pressure in the hydraulic lines.
Check to see that the cutting edges of this product are parallel to the level surface.  If they are not 
parallel, make the edges and the level surface parallel by following the instructions for adjustment of 
the 3-point hitch as found in the operator's manual(s) for your prime mover and 3-point hitch.
Check to see that the bases of the main frame end plates are parallel to the level surface.  If they are 
not parallel, make the bases and the level surface parallel by adjusting the 3-point hitch's top link as 
described in the operator's manual(s) for the prime mover and 3-point hitch.

SCARIFYING

Perform steps 1 through 6 above.
Check to see that the bases of the main frame end plates are leaning forward approximately 15 
degrees relative to the level surface.  If this is not the case, adjust the 3-point hitch's top link as 
described in the operator's manual(s) for your prime mover and 3-point hitch.  Leaning this product 
forward 15 degrees will lift the cutting edges up a few inches off the level surface and will result 
in the straight upper portion of the ripper shanks being perpendicular (90 degrees) to the ground 
surface during operation.
Verify that the ripper shanks are set in the proper slot for performing the desired work.  When the 
front edges of the main frame end plates are flush with the ground level, then:

      •    positioning the ripper shanks in the lower slot will produce a 3-3/4" deep cut and
      •    positioning the ripper shanks in the upper slot will produce a 6-1/4" deep cut.
      See RIPPER SHANK ADJUSTMENT AND REPLACEMENT in the Service section of this manual for  
      instructions on how to reposition the ripper shanks.

IMPORTANT 

  Operating this product with the ripper shanks only partially extended into the ground

 

 

 

CAN result in damage to this product and

 

 

 

WILL void all FFC warranties.

4.   Restart your prime mover and raise the 3-point hitch.  Completely retract the hydraulic cylinder to     
      extend the ripper shanks to their lowest and locked position.  Failure to lower the ripper shanks
      until the locking mechanism engages will result in excessive hydraulic cylinder strain and could           
      cause permanent hydraulic cylinder damage.
     

1.
2.
3.
4.

5.

6.

7.

1.
2.

3.

 

Содержание 13884

Страница 1: ... 503 Gay Street Delhi IA 52223 United States of America SERIAL NUMBER ___________________ Manual Number MR15554 Part Number 13884 13888 MODEL NUMBER ___________________ Rev 2 OPERATOR S AND PARTS MANUAL BOX SCRAPER 2 19 09 13888 Shown ...

Страница 2: ......

Страница 3: ... 2 SERIAL NUMBER 2 OWNER AND OPERATOR SAFETY INFORMATION SAFETY STATEMENTS 3 SAFETY PRECAUTIONS 4 5 SAFETY SIGNS 6 7 SPECIFICATIONS 8 9 MOUNTING 10 HYDRAULIC CONNECTION 11 SETUP 12 OPERATION 13 MAINTENANCE 14 15 SERVICE 16 17 PARTS ILLUSTRATION 18 PARTS LIST 19 WARRANTY i ...

Страница 4: ...s to assist in assembling mounting operating and maintaining your Box Scraper Read this manual carefully to obtain valuable information and instructions that will help you achieve years of safe and dependable service The illustrations and data used in this manual were current at the time of printing but due to possible engineering and or production changes this product may vary slightly in detail ...

Страница 5: ...lated to this equipment and the prime mover thoroughly before beginning installation operation or maintenance FOLLOW ALL SAFETY INSTRUCTIONS IN THIS MANUAL AND THE PRIME MOVER S MANUAL S READ AND UNDERSTAND ALL SAFETY STATEMENTS Read all safety decals and safety statements in all manuals prior to operating or working on this equipment Know and obey all OSHA regulations local laws and other profess...

Страница 6: ...WITH HYDRAULIC FLUID PRESSURE Hydraulic fluid under pressure can penetrate the skin and cause serious injury or death Hydraulic leaks under pressure may not be visible Before connecting or disconnecting hydraulic hoses read your prime movers operator s manual for detailed instructions on connecting and disconnecting hydraulic hoses or fittings Keep unprotected body parts such as face eyes and arms...

Страница 7: ... specified by the tool manufacturer WARNING SAFELY OPERATE EQUIPMENT Do not operate equipment until you are completely trained by a qualified operator in how to use the controls know its capabilities dimensions and all safety requirements See your machine s manual for these instructions Keep all step plates grab bars pedals and controls free of dirt grease debris and oil Never allow anyone to be a...

Страница 8: ...S Keep all safety signs clean and legible Replace all missing illegible or damaged safety signs Replacement parts for parts with safety signs attached must also have safety signs attached Safety signs are available free of charge from your dealer or from FFC PLACEMENT OR REPLACEMENT OF SAFETY SIGNS 1 Clean the area of application with non flammable solvent and then wash the same area with soap and...

Страница 9: ...2 19 09 MR15554 7 SAFETY SIGNS PART 40150 WARNING READ MANUAL PART 50 0724 WARNING HIGH PRESSURE FLUID PART 50 0737 WARNING PINCH POINT HAZARD PART RDL3155 RED REFLECTIVE TAPE ...

Страница 10: ...aulic Pressure Output 4 000 psi maximum Rear Ballast As required to maintain full prime mover stability Note the Shipping Weight on the specifications page then see the operator s manual s for your prime mover 3 point hitch and quick hitch for ballasting needs BOX SCRAPER SPECIFICATIONS Model Number Overall Width Overall Height Overall Depth Cutting Width Excavation Capacity Shipping Weight 13884 ...

Страница 11: ... 2312 2743 3135 1 1 2 38 10 1649 1870 2236 2535 2686 3026 3642 4103 METRIC BOLT TORQUE SPECIFICATIONS NOTE The following torque values are for use with metric hard ware that is unplated and either dry or lubricated with engine oil Reduce torque 15 when using hardware that has extreme pressure lubricants plating or hard washer applications Size of Bolt Grade No Pitch mm Pounds Feet Newton Meters Pi...

Страница 12: ... PRIME MOVER S MANUAL S 1 Place this product on a firm level surface that is large enough to safely accommodate this product your prime mover and all workers involved in the mounting process 2 Refer to the operator s manual s for your prime mover 3 point hitch and quick hitch and follow the mounting instructions contained therein 3 Carefully raise the 3 point hitch to check clearances and to verif...

Страница 13: ...or your prime mover will describe the exact type of fitting that is needed for your hydraulic coupling system but in no case should any fitting have an allowable operating pressure of less than 4 000 psi Once all the quick coupler fittings are properly installed then the hoses can be coupled to the prime mover s hydraulic valve body or auxiliary hydraulic lines as per the instructions found in you...

Страница 14: ...he operator s manual s for the prime mover and 3 point hitch SCARIFYING Perform steps 1 through 6 above Check to see that the bases of the main frame end plates are leaning forward approximately 15 degrees relative to the level surface If this is not the case adjust the 3 point hitch s top link as described in the operator s manual s for your prime mover and 3 point hitch Leaning this product forw...

Страница 15: ...es IMPORTANT Backing up with any portion of the ripper shanks below the ground surface CAN result in damage to this product and WILL void all FFC warranties Before beginning any work have a qualified individual or firm inspect the entire work area for underground utility lines The operator should carefully inspect the entire area for stumps concrete foundations large rocks posts or any other solid...

Страница 16: ... and bolts are in place and properly tightened Make sure that all other fasteners are in place and are performing their specified function Make sure that all hydraulic fittings are tightened to specifications and that there are no leaks in any fittings or hoses SEE THE HYDRAULIC CONNECTION SECTION Make sure that all safety signs are in place are clean and are legible SEE THE SAFETY SIGN SECTION Re...

Страница 17: ...2 19 09 MR15554 15 MAINTENANCE MAINTENANCE RECORD Use this log to record maintenance performed on the attachment Date Maintenance Procedure Performed Performed by Comments ...

Страница 18: ...pper shank that extends to the front side of the scarifier tube and lift up while pushing down with the other hand on the opposite end of the ripper shank When clear of the ripper shank slot slide the ripper shank to the other slot or completely out to the rear of the scarifier tube whichever is the desired option For ripper shank adjustment or replacement skip to step 11 To replace the shank poin...

Страница 19: ... product is completely stable on the blocking If the blocking appears to be unstable or is even of questionable stability restart your prime mover raise this product off the blocking and move away from the blocking After the blocking has been repositioned in a more stable fashion repeat steps 1 through 5 until a completely stable condition exists 6 TWO WORKERS ARE REQUIRED to remove a cutting edge...

Страница 20: ...15554 18 BOX SCRAPER PARTS ILLUSTRATION 8 3 41 29 3 3 29 34 18 24 1 33 30 27 9 26 32 2 26 7 12 25 42 24 31 12 32 36 23 35 4 29 3 14 28 31 20 23 21 19 37 35 11 5 29 3 11 35 40 43 38 13 31 44 15 16 39 17 15 6 10 22 ...

Страница 21: ...Cylinder 3 Piston x 6 Stroke x 1 75 Shaft 22 1 LAF9401 Split Sleeve 1 25 x 1 x 2 with Ext Grease Groove 23 2 LAF9798 Cylinder Pin 1 x 7 5 24 3 1047 Hex Head Cap Screw 38 x 2 Grade 5 25 1 1116 Hex Head Cap Screw 63 x 2 Grade 5 26 varies 14 26 10150 Plow Bolt 63 x 2 Grade 8 27 10 n a 1528 Flat Washer SAE 63 Grade 5 28 6 1706 Flat Washer SAE 1 Grade 8 Yellow 29 5 RHW5973 Machinery Bushing 2 x 1 x 0 0...

Страница 22: ...ption to repair or replace the product b Timely Repair and Notice In order to obtain the Limited Warranty i the product must be repaired within thirty 30 days from the date of failure and ii a claim under the warranty must be submitted to Paladin Light Construction in writing within thirty 30 days from the date of repair c Return of Defective Part or Product If requested by Paladin Light Construct...

Страница 23: ......

Отзывы: