Festo SOPA Скачать руководство пользователя страница 5

Ä

Ä

SOPA-...-PNLK-VB-...

SOPA-...-PNLK-A-...

Tab. 15: Circuit diagrams for sensor module

7

Commissioning

7.1

Commissioning the sensor

Switch on operating voltage.

Ä

RUN mode is active.

To activate the RUN mode at any time, press and hold the Edit button for 3
seconds.

7.2

Setting switching point A

Switching output OutA is preset for distance monitoring. The switching point for
OutA must be set or taught manually.
Option 1: manually setting the switching point for OutA
1. Press the Edit button.

Ä

EDIT mode is active. [OutA] flashes. Lock flashes with active security
blocking.

2. Enter the set security code using the A or B pushbutton.
3. Press the Edit button to confirm the selection.

Ä

[SP] flashes.

4. Set switching point with the A or B pushbutton.
5. Press and hold the EDIT button for 3 seconds.

Ä

RUN mode is active.

Option 2: teaching-in the switching point for OutA
1. Establish the desired switching distance between the object and the meas-

uring nozzle.

2. Press and hold the A pushbutton.
3. Also press the Edit button.

[OutA] and [TeachIn] flash. The value is adopted as the switching
point.

[Lock] flashes: security lock active. The value is buffered.

4. Enter the set security code using the A or B pushbutton.
5. Press the Edit button.

[OutA] and [TeachIn] flash. The cached value is accepted as the
switching point.

RUN mode is active.

7.3

Menu structure (EDIT mode)

Some menu options or setting values are not applicable depending on the product
variant and the selected switching function.

Fig. 13: EDIT mode menu structure

Key

Meaning

Edit button
A or B pushbutton

bold

Factory setting

1)

Menu column only for PNLK-VB/A

2)

Menu item only with PNLK-VB

3)

Menu item only for PNLK-VB/A

4)

Menu column and menu item only for 2P/2N

Tab. 16: Legend for menu structure EDIT mode

Содержание SOPA

Страница 1: ...tegory code NRNT2 NRNT8 File number E253738 Considered standards UL 508 CSA22 2 No 14 UL mark Tab 2 UL CSA certification information This device is intended to be used with a Class 2 power source or C...

Страница 2: ...max flash SHOW mode active 7 segment display shows the minimum or maximum value InC Marked segments light and Option flashes EDIT mode active Special menu opens 7 segment display shows the set option...

Страница 3: ...Pmax IO Link SP1 SPmin SP2 SPmax no TEACH mode Tab 7 Window comparator with switching point SP and hysteresis HY Hysteresis Hysteresis serves to suppress switching signals in the event of fluctuations...

Страница 4: ...204 1 for PELV circuits Only use voltage sources that ensure a reliable electric separation from the mains network in accordance with IEC 60204 1 EN 60204 1 1 Use signal lines that are shorter than 30...

Страница 5: ...onds RUN mode is active Option 2 teaching in the switching point for OutA 1 Establish the desired switching distance between the object and the meas uring nozzle 2 Press and hold the A pushbutton 3 Al...

Страница 6: ...nger displayed 4 If the delay SUP P in the display is too great reduce the time by turning the control valve towards HIGH 9 Maintenance and Care 1 Switch off the energy sources operating voltage compr...

Страница 7: ...resent Electronic Rated operating voltage V DC 24 Operating voltage V DC 15 0 30 0 20 0 30 0 22 8 26 4 No load supply current mA 50 10 Reverse polarity protection for all electrical connections Electr...

Страница 8: ...1 193 IODD IO Link device description www festo com sp Tab 21 IO Link 12 2 Diagrams Response times for different tube lengths Fig 17 Typical response time t as a function of distance x after switching...

Отзывы: