Commissioning
© Festo Didactic GmbH & Co. • MPS
21
Please check the adjustment of all sensors and of the mechanical components of
your station to prepare the test of the whole process.
Information
To find out the function and location of the sensors, please use the technical
manual. The inputs can also be checked directly at the PLC-LED´s. To move
pneumatic actuators, please switch off the air-pressure and move them manually by
hand. Please be very careful, move the actuators back before switching on the air-
pressure again. Some pneumatic and the electrical actuators can not be moved in
this way-the pneumatic components can be activated by the manual detection
button on the valve (see picture)
Instructor:show the participants how to find out an input and an output using the
wiring diagrams. Show them why some actuators can not be moved by hand even
without air- and power supply (DC-motors and 5/3-way valves) using the
pneumatic plan to explain. Show them an example how to adjust a sensor to
define the back or front position of a cylinder. Provide the necessary tools.
Deadjust the following sensors and mechanical components (bold)
I/O Station
Adress
Symbol
Ident.
Description
I0.0
Part_av
Part_AV
Workpiece is available
I0.1
Han_prev
1B1
Handling at previous station
I0.2
Han_foll
1B2
Handling at following station
I0.3
Han_sort
1B3
Handling at sorting position
I0.4
Lift_dow
2B1
Lifting cylinder with gripper is down
I0.5
Lift _up
2B2
Lifting cylinder with gripper is up
I0.6
Sen_mat
3B1
Material detection signal = 0 = black
I0.7
Follow
IP_FL
Light barrier to the following station
Q0.0
Handprev
1Y1
Solenoid of handling cyl.to previous station
Q0.1
Handfoll
1Y2
Solenoid of handling cyl.to following station
Q0.2
Lifting
2Y1
Solenoid of the lifting cylinder with gripper
Q0.3
Gripper
3Y1
Solenoid of the gripper = 1 = open
Q0.7
Previous
IP_N_FO Light barrier to the previous station
Deadjust the workpiece mounting so that the gripper is not able to pick up the
workpiece centred and close the one-way-flow control valve of the lifting cylinder
to move up.
1.5
Commissioning –
Adjustment of the
Station
Содержание MPS 2000
Страница 1: ... Festo Didactic GmbH Co MPS 1 Handling Station MPS 2000 Instructors Edition ...
Страница 14: ...Commissioning 12 Festo Didactic GmbH Co MPS Execution Documentation ...
Страница 34: ...Commissioning 32 Festo Didactic GmbH Co MPS ...
Страница 37: ...Programming Festo Didactic GmbH Co MPS 35 Insert à Station à SIMATIC 300 Station ...
Страница 38: ...Programming 36 Festo Didactic GmbH Co MPS P2_01 à SIMATIC 300 1 à Hardware double click ...
Страница 39: ...Programming Festo Didactic GmbH Co MPS 37 SIMATIC 300 à RACK 300 à Rail à double click ...
Страница 44: ...Programming 42 Festo Didactic GmbH Co MPS SIMATIC 300 à Station à Save and Compile ...
Страница 50: ...Programming 48 Festo Didactic GmbH Co MPS ...
Страница 55: ...Programming Festo Didactic GmbH Co MPS 53 P2_02 right mouse button on the project P2_02 à Paste ...
Страница 56: ...Programming 54 Festo Didactic GmbH Co MPS X close the project P2_01 ...
Страница 57: ...Programming Festo Didactic GmbH Co MPS 55 P2_02 à Insert à Program à S7 Program ...
Страница 58: ...Programming 56 Festo Didactic GmbH Co MPS S7 Program 2 à Blocks à Insert à S7 Block à Function ...
Страница 65: ...Programming Festo Didactic GmbH Co MPS 63 ...
Страница 69: ...Programming Festo Didactic GmbH Co MPS 67 ...
Страница 71: ...Programming Festo Didactic GmbH Co MPS 69 Program FC1 ...
Страница 74: ...Programming 72 Festo Didactic GmbH Co MPS Execution Documentation Program OB1 ...
Страница 79: ...Programming Festo Didactic GmbH Co MPS 77 Execution Documentation Program OB1 ...
Страница 84: ...Programming 82 Festo Didactic GmbH Co MPS CPU 314 right mouse button à Paste ...
Страница 87: ...Programming Festo Didactic GmbH Co MPS 85 New structure of the project ...
Страница 89: ...Programming Festo Didactic GmbH Co MPS 87 Program FC1 ...
Страница 94: ...Programming 92 Festo Didactic GmbH Co MPS Program FC1 ...
Страница 105: ...Programming Festo Didactic GmbH Co MPS 103 ...
Страница 108: ...Programming 106 Festo Didactic GmbH Co MPS ...
Страница 109: ...Programming Festo Didactic GmbH Co MPS 107 ...
Страница 110: ...Programming 108 Festo Didactic GmbH Co MPS ...
Страница 116: ...Programming 114 Festo Didactic GmbH Co MPS Execution Documentation ...
Страница 117: ...Programming Festo Didactic GmbH Co MPS 115 Program FC1 OB1 is the same than in the project before ...
Страница 118: ...Programming 116 Festo Didactic GmbH Co MPS ...
Страница 119: ...Programming Festo Didactic GmbH Co MPS 117 ...
Страница 123: ...Programming Festo Didactic GmbH Co MPS 121 ...
Страница 124: ...Programming 122 Festo Didactic GmbH Co MPS ...
Страница 125: ...Programming Festo Didactic GmbH Co MPS 123 ...
Страница 126: ...Programming 124 Festo Didactic GmbH Co MPS ...
Страница 127: ...Programming Festo Didactic GmbH Co MPS 125 ...
Страница 128: ...Programming 126 Festo Didactic GmbH Co MPS ...
Страница 129: ...Programming Festo Didactic GmbH Co MPS 127 ...
Страница 130: ...Programming 128 Festo Didactic GmbH Co MPS ...
Страница 131: ...Programming Festo Didactic GmbH Co MPS 129 ...
Страница 132: ...Programming 130 Festo Didactic GmbH Co MPS ...
Страница 133: ...Programming Festo Didactic GmbH Co MPS 131 ...
Страница 134: ...Programming 132 Festo Didactic GmbH Co MPS ...
Страница 135: ...Programming Festo Didactic GmbH Co MPS 133 ...
Страница 136: ...Programming 134 Festo Didactic GmbH Co MPS ...
Страница 138: ...Trouble Shooting 136 Festo Didactic GmbH Co MPS Original Project 2 2 time to finish approx 0 5 h ...
Страница 139: ...Trouble Shooting Festo Didactic GmbH Co MPS 137 Error Project 2 2 ...
Страница 140: ...Trouble Shooting 138 Festo Didactic GmbH Co MPS Original Project 2 3 time to finish approx 0 5 h ...
Страница 141: ...Trouble Shooting Festo Didactic GmbH Co MPS 139 Error Project 2 3 ...
Страница 142: ...Trouble Shooting 140 Festo Didactic GmbH Co MPS Original Project 2 4 time to finish approx 0 5 h ...
Страница 143: ...Trouble Shooting Festo Didactic GmbH Co MPS 141 Error Project 2 4 ...
Страница 144: ...Trouble Shooting 142 Festo Didactic GmbH Co MPS Original Project 2 5 time to finish approx 0 5 h ...
Страница 145: ...Trouble Shooting Festo Didactic GmbH Co MPS 143 Error Project 2 5 ...
Страница 146: ...Trouble Shooting 144 Festo Didactic GmbH Co MPS Original Project 2 6 time to finish approx 45 min ...
Страница 147: ...Trouble Shooting Festo Didactic GmbH Co MPS 145 Error Project 2 6 ...
Страница 148: ...Trouble Shooting 146 Festo Didactic GmbH Co MPS Original Project 2 7 time to finish approx 0 5 h ...
Страница 149: ...Trouble Shooting Festo Didactic GmbH Co MPS 147 Error Project 2 7 ...
Страница 150: ...Trouble Shooting 148 Festo Didactic GmbH Co MPS Original Project 2 8 time to finish approx 45 min ...
Страница 151: ...Trouble Shooting Festo Didactic GmbH Co MPS 149 Error Project 2 8 ...
Страница 152: ...Trouble Shooting 150 Festo Didactic GmbH Co MPS Original Project 2 9 time to finish approx 45 min ...
Страница 153: ...Trouble Shooting Festo Didactic GmbH Co MPS 151 Error Project 2 9 ...
Страница 154: ...Trouble Shooting 152 Festo Didactic GmbH Co MPS Original Project 2 10 time to finish approx 0 5 h ...
Страница 155: ...Trouble Shooting Festo Didactic GmbH Co MPS 153 Error Project 2 10 ...
Страница 156: ...Trouble Shooting 154 Festo Didactic GmbH Co MPS Original Project 2 11 time to finish approx 45 min ...
Страница 157: ...Trouble Shooting Festo Didactic GmbH Co MPS 155 Error Project 2 11 ...
Страница 158: ...Trouble Shooting 156 Festo Didactic GmbH Co MPS Original Project 2 12 time to finish approx 0 5 h ...
Страница 159: ...Trouble Shooting Festo Didactic GmbH Co MPS 157 Error Project 2 12 ...
Страница 160: ...Trouble Shooting 158 Festo Didactic GmbH Co MPS Original Project 2 13 time to finish approx 1 0 h ...
Страница 161: ...Trouble Shooting Festo Didactic GmbH Co MPS 159 Error Project 2 13 ...
Страница 163: ...Trouble Shooting Festo Didactic GmbH Co MPS 161 ...
Страница 164: ...Trouble Shooting 162 Festo Didactic GmbH Co MPS ...
Страница 165: ...Trouble Shooting Festo Didactic GmbH Co MPS 163 Error in Project ...