Programming
© Festo Didactic GmbH & Co. • MPS
119
One aluminium workpiece shall come from a previous station and inserted into the
Handling Station, checked that the workpiece is not black and moved to the
following station.
After mechanical connection of the previous station and the following station, the
CPU have to be set to RUN and the light barrier signal will be sent to the previous
station.
Before starting, the station have to be in home position (use Project 2.15). The
homing position process can only be started, if the following station is in place (light
barrier signal).
After pressed the Start-button shortly at each station, the cycle starts. but only if the
following station have been started already and is ready to take a workpiece.
Information
Please edit the program FC1 in FBD which starts without any condition. Edit with
symbols. Use the list of inputs and outputs from Project 1.3 to find necessary
informations. The OB1 is in STL.
Instructor: Please explain very clearly what you want to have – if home-position is
running it´s not able to Start, if Start-condition is running it´s not able to run the
home-position sequence. Discuss within the whole team, how to start the cycle
step by step which means, which station have to be started first, second a.s.o.
Please do the planning together with the participants. Go ahead step by step and
show always the condition and the action at the station directly. Explain to the
participants, why a connected station is creating a 0-signal at the light barrier.
Discuss the communication handshake together with all teams. Make sure, this
project is not longer than 3,0 hours.
Planning
Please plan your project step by step first within the whole team for one station first.
Use your program from Project 2.15 as a base for this project. Plan your
communication with the other team carefully. Please make sure, that the
communication input 1 (following station started and ready) is on as long as the
workpiece is inserted into the following station. Discuss with the team of the
following station also, that they have to wait for the communication output 1
(communication input 1 at the following station) to start their process.
The time to finish this project should be around 3,0 hour.
2.18
Project –
Material-flow
through the FMS
Содержание MPS 2000
Страница 1: ... Festo Didactic GmbH Co MPS 1 Handling Station MPS 2000 Instructors Edition ...
Страница 14: ...Commissioning 12 Festo Didactic GmbH Co MPS Execution Documentation ...
Страница 34: ...Commissioning 32 Festo Didactic GmbH Co MPS ...
Страница 37: ...Programming Festo Didactic GmbH Co MPS 35 Insert à Station à SIMATIC 300 Station ...
Страница 38: ...Programming 36 Festo Didactic GmbH Co MPS P2_01 à SIMATIC 300 1 à Hardware double click ...
Страница 39: ...Programming Festo Didactic GmbH Co MPS 37 SIMATIC 300 à RACK 300 à Rail à double click ...
Страница 44: ...Programming 42 Festo Didactic GmbH Co MPS SIMATIC 300 à Station à Save and Compile ...
Страница 50: ...Programming 48 Festo Didactic GmbH Co MPS ...
Страница 55: ...Programming Festo Didactic GmbH Co MPS 53 P2_02 right mouse button on the project P2_02 à Paste ...
Страница 56: ...Programming 54 Festo Didactic GmbH Co MPS X close the project P2_01 ...
Страница 57: ...Programming Festo Didactic GmbH Co MPS 55 P2_02 à Insert à Program à S7 Program ...
Страница 58: ...Programming 56 Festo Didactic GmbH Co MPS S7 Program 2 à Blocks à Insert à S7 Block à Function ...
Страница 65: ...Programming Festo Didactic GmbH Co MPS 63 ...
Страница 69: ...Programming Festo Didactic GmbH Co MPS 67 ...
Страница 71: ...Programming Festo Didactic GmbH Co MPS 69 Program FC1 ...
Страница 74: ...Programming 72 Festo Didactic GmbH Co MPS Execution Documentation Program OB1 ...
Страница 79: ...Programming Festo Didactic GmbH Co MPS 77 Execution Documentation Program OB1 ...
Страница 84: ...Programming 82 Festo Didactic GmbH Co MPS CPU 314 right mouse button à Paste ...
Страница 87: ...Programming Festo Didactic GmbH Co MPS 85 New structure of the project ...
Страница 89: ...Programming Festo Didactic GmbH Co MPS 87 Program FC1 ...
Страница 94: ...Programming 92 Festo Didactic GmbH Co MPS Program FC1 ...
Страница 105: ...Programming Festo Didactic GmbH Co MPS 103 ...
Страница 108: ...Programming 106 Festo Didactic GmbH Co MPS ...
Страница 109: ...Programming Festo Didactic GmbH Co MPS 107 ...
Страница 110: ...Programming 108 Festo Didactic GmbH Co MPS ...
Страница 116: ...Programming 114 Festo Didactic GmbH Co MPS Execution Documentation ...
Страница 117: ...Programming Festo Didactic GmbH Co MPS 115 Program FC1 OB1 is the same than in the project before ...
Страница 118: ...Programming 116 Festo Didactic GmbH Co MPS ...
Страница 119: ...Programming Festo Didactic GmbH Co MPS 117 ...
Страница 123: ...Programming Festo Didactic GmbH Co MPS 121 ...
Страница 124: ...Programming 122 Festo Didactic GmbH Co MPS ...
Страница 125: ...Programming Festo Didactic GmbH Co MPS 123 ...
Страница 126: ...Programming 124 Festo Didactic GmbH Co MPS ...
Страница 127: ...Programming Festo Didactic GmbH Co MPS 125 ...
Страница 128: ...Programming 126 Festo Didactic GmbH Co MPS ...
Страница 129: ...Programming Festo Didactic GmbH Co MPS 127 ...
Страница 130: ...Programming 128 Festo Didactic GmbH Co MPS ...
Страница 131: ...Programming Festo Didactic GmbH Co MPS 129 ...
Страница 132: ...Programming 130 Festo Didactic GmbH Co MPS ...
Страница 133: ...Programming Festo Didactic GmbH Co MPS 131 ...
Страница 134: ...Programming 132 Festo Didactic GmbH Co MPS ...
Страница 135: ...Programming Festo Didactic GmbH Co MPS 133 ...
Страница 136: ...Programming 134 Festo Didactic GmbH Co MPS ...
Страница 138: ...Trouble Shooting 136 Festo Didactic GmbH Co MPS Original Project 2 2 time to finish approx 0 5 h ...
Страница 139: ...Trouble Shooting Festo Didactic GmbH Co MPS 137 Error Project 2 2 ...
Страница 140: ...Trouble Shooting 138 Festo Didactic GmbH Co MPS Original Project 2 3 time to finish approx 0 5 h ...
Страница 141: ...Trouble Shooting Festo Didactic GmbH Co MPS 139 Error Project 2 3 ...
Страница 142: ...Trouble Shooting 140 Festo Didactic GmbH Co MPS Original Project 2 4 time to finish approx 0 5 h ...
Страница 143: ...Trouble Shooting Festo Didactic GmbH Co MPS 141 Error Project 2 4 ...
Страница 144: ...Trouble Shooting 142 Festo Didactic GmbH Co MPS Original Project 2 5 time to finish approx 0 5 h ...
Страница 145: ...Trouble Shooting Festo Didactic GmbH Co MPS 143 Error Project 2 5 ...
Страница 146: ...Trouble Shooting 144 Festo Didactic GmbH Co MPS Original Project 2 6 time to finish approx 45 min ...
Страница 147: ...Trouble Shooting Festo Didactic GmbH Co MPS 145 Error Project 2 6 ...
Страница 148: ...Trouble Shooting 146 Festo Didactic GmbH Co MPS Original Project 2 7 time to finish approx 0 5 h ...
Страница 149: ...Trouble Shooting Festo Didactic GmbH Co MPS 147 Error Project 2 7 ...
Страница 150: ...Trouble Shooting 148 Festo Didactic GmbH Co MPS Original Project 2 8 time to finish approx 45 min ...
Страница 151: ...Trouble Shooting Festo Didactic GmbH Co MPS 149 Error Project 2 8 ...
Страница 152: ...Trouble Shooting 150 Festo Didactic GmbH Co MPS Original Project 2 9 time to finish approx 45 min ...
Страница 153: ...Trouble Shooting Festo Didactic GmbH Co MPS 151 Error Project 2 9 ...
Страница 154: ...Trouble Shooting 152 Festo Didactic GmbH Co MPS Original Project 2 10 time to finish approx 0 5 h ...
Страница 155: ...Trouble Shooting Festo Didactic GmbH Co MPS 153 Error Project 2 10 ...
Страница 156: ...Trouble Shooting 154 Festo Didactic GmbH Co MPS Original Project 2 11 time to finish approx 45 min ...
Страница 157: ...Trouble Shooting Festo Didactic GmbH Co MPS 155 Error Project 2 11 ...
Страница 158: ...Trouble Shooting 156 Festo Didactic GmbH Co MPS Original Project 2 12 time to finish approx 0 5 h ...
Страница 159: ...Trouble Shooting Festo Didactic GmbH Co MPS 157 Error Project 2 12 ...
Страница 160: ...Trouble Shooting 158 Festo Didactic GmbH Co MPS Original Project 2 13 time to finish approx 1 0 h ...
Страница 161: ...Trouble Shooting Festo Didactic GmbH Co MPS 159 Error Project 2 13 ...
Страница 163: ...Trouble Shooting Festo Didactic GmbH Co MPS 161 ...
Страница 164: ...Trouble Shooting 162 Festo Didactic GmbH Co MPS ...
Страница 165: ...Trouble Shooting Festo Didactic GmbH Co MPS 163 Error in Project ...