4
Commissioning
Festo – P.BE-CPX-CTEL-EN – 1601b – English
39
4.7.3
Parameterisation with the operator unit (CPX-MMI)
You can use the operator unit to parameterise for test purposes in the commissioning phase, for
troubleshooting or for fieldbus protocols which do not support parameterisation via the fieldbus
(
è
System overview
Monitoring/forcing (M)
Diagnostics (D)
Parameters (P)
Fail Safe (F)
Module Data (MD)
2:CTEL: P
I-Port 1 configuration: …
I-Port 2 configuration: …
I-Port 3 configuration: …
I-Port 4 configuration: …
CTEL I/O mode: …
CTEL I/O length: …
Behaviour after I-Port SC: …
Device parameter I-Port 1:
Byte 1..0: 0x…
Byte 3..2: 0x…
Byte 5..4: 0x…
Byte 7..6: 0x…
Device parameter I-Port 2:
Byte 1..0: 0x…
…
1
2
1
Parameter CTEL master module
2
Parameter I-Port devices
Fig. 4.3
Содержание CPX-CTEL-4-M12-5POL
Страница 58: ......