1. System summary
1-11
Festo P.BE-CB-COMP-EN en 0211a
Planning the size of the buffer zone
sections
CBC
Classic
CBC
PLC
Buffer zone section A
Section between conveyor device and sensor
Section A must accept all conveyed parts which
lie between the Checkbox and the sensor when
a conveyed part has been registered by the
sensor. The length depends on:
– the geometry of the conveyed parts
– the maximum transport rate of the small
parts conveyor
– the length of the transport device
x
x
Buffer zone section AB
Section between sensors 1 and 2 (only buffer
zones with 2 sensors)
Section AB determines the switching delay
(hysteresis) of the small parts conveyor for
regulating the supply of parts. The longer the
section, the less the switching frequency.
-
x
Buffer zone section B
Section between sensor and following machine
When the small parts conveyor is switched on
again, operation of the assembly plant without
interruption must be guaranteed before the first
new conveyed parts arrive.
Section B must be designed so that a sufficient
number of conveyed parts are available. The
length depends on:
– the geometry of the conveyed parts
– the maximum time delay between the small
parts conveyor being switched on again and
the availability of the new conveyed parts.
– the length and speed of the transport device
– the average number of good parts conveyed
in the nominal orientation
x
x
Содержание Checkbox Compact CHB-C-C
Страница 1: ...Manual Checkbox Compact Type CHB C C Type CHB C P Manual 533 412 en 0211a 663 484 Checkbox Compact...
Страница 2: ...Festo Checkbox is a registered trademark of Festo AG Co D 73726 Esslingen Deutschland...
Страница 4: ...Contents and general instructions II Festo P BE CB COMP EN en 0211a...
Страница 5: ...Contents and general instructions III Festo P BE CB COMP EN en 0211a...
Страница 17: ...System summary 1 1 Festo P BE CB COMP EN en 0211a Chapter 1...
Страница 28: ...1 System summary 1 12 Festo P BE CB COMP EN en 0211a...
Страница 29: ...Fitting and commissioning 2 1 Festo P BE CB COMP EN en 0211a Chapter 2...
Страница 49: ...The I O module 3 1 Festo P BE CB COMP EN en 0211a Chapter 3...
Страница 60: ...3 The I O module 3 12 Festo P BE CB COMP EN en 0211a...
Страница 61: ...I O module extensions of the Checkbox PLC 4 1 Festo P BE CB COMP EN en 0211a Chapter 4...
Страница 79: ...Teaching parts 5 1 Festo P BE CB COMP EN en 0211a Chapter 5...
Страница 89: ...Testing parts 6 1 Festo P BE CB COMP EN en 0211a Chapter 6...
Страница 98: ...6 Testing parts 6 10 Festo P BE CB COMP EN en 0211a...
Страница 99: ...Maintenance 7 1 Festo P BE CB COMP EN en 0211a Chapter 7...
Страница 100: ...7 Maintenance 7 2 Festo P BE CB COMP EN en 0211a Contents 7 Maintenance 7 1 7 1 General information 7 3 7 2 Cleaning 7 4...
Страница 103: ...Technical appendix A 1 Festo P BE CB COMP EN en 0211a Appendix A...
Страница 130: ...A Technical appendix A 28 Festo P BE CB COMP EN en 0211a...
Страница 131: ...Index B 1 Festo P BE CB COMP EN en 0211a Appendix B...
Страница 132: ...B Index B 2 Festo P BE CB COMP EN en 0211a Contents B Index B 3...